Quality cost and delivery
Construction Quality Planning Guide, Draft for Consultation, Published by the Construction Innovation Hub in May 2020, suggests that Quality, Cost, and Delivery (QCD) is: ‘An umbrella term for seven key performance measures originally developed by the automotive industry but now used to improve production performance across a wide range of industries. QCD includes the following, all of which use simple mathematical equations to analyse production performance: Not right first time (NRFT), delivery schedule achievement, people productivity, stock turns, overall equipment effectiveness, value added per person, and floor space utilisation.’
[edit] Related articles on Designing Buildings
- Advanced product quality planning.
- Construction Innovation Hub.
- Construction product approval process.
- Construction quality planning.
- Not right first time.
- Plan, Do, Check, Act (PDCA).
- Product design requirements.
- Product validation.
- Production readiness review.
- Project quality plan.
- Quality control.
- Quality in construction projects.
- Quality.
- Quality, load and capacity report.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 June
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.

















