Last edited 01 Mar 2021

Non-volumetric preassembly

The BIM Overlay to the RIBA Outline Plan of Work, published by the RIBA in 2012 suggested that non-volumetric preassembly is: ‘Preassembly of items that are non-volumetric: i.e. they do not enclose usable space. Includes cladding panels, building services ductwork, precast concrete bridge sections, structural steelwork trusses etc.'

[edit] Related articles on Designing Buildings Wiki

Designing Buildings Anywhere

Get the Firefox add-on to access 20,000 definitions direct from any website

Find out more Accept cookies and
don't show me this again
"