International Existing Building Code (IEBC)
Building codes are regulations that set out the standards to which buildings and other structures must conform. The International Existing Building Code (IEBC) is a code established in the US by the International Code Council (ICC) and applied by most of the country’s jurisdictions as well as in some other countries internationally, (sometimes amended to reflect local conditions and legislation).
The sets out requirements for repairs, alterations and additions to existing buildings and structures. It applies to work on buildings and structures that were constructed before the introduction of the building code requirements in 2000.
In many cases, the cost of works that would be required to bring a building up to current compliance levels can be prohibitively high. The code provides three options that allow a controlled departure from full compliance with the codes dealing with new construction while at the same time maintaining basic standards for structural performance, fire prevention and other health and safety issues.
The main options provided by the code:
Option 1: Work shall be done in accordance with a Prescriptive Compliance Method. This follows provisions included in the IBC such as the following requirements:
- Existing materials shall be permitted to remain in use unless determined to be unsafe.
- New and replacement materials must conform to the applicable code for new construction.
- The building official has the authority to demand changes or works to be done to eliminate conditions that are deemed dangerous.
- Any additions must comply with the International Building Code (IBC) for new construction.
- Any alterations to the existing building must be such that the building as a whole is no less compliant with the IBC provisions that it was without the alterations.
- The building use or occupancy shall not be changed unless it is made to comply with the IBC.
- Historic buildings that are listed in the National Register of Historic Places do not need to be brought into compliance.
- Structures that are moved must comply with the IBC provisions for new structures.
Option 2: Work shall be done in accordance with a Work Area Compliance Method. This is the most flexible of the three options since specific code provisions are triggered only if the scale and level of work warrant them.
Option 3: Performance method. This is the least used of the three options. It provides the design team with a method of scoring the existing safety conditions of a building. Improvements must then be undertaken to improve the score to an acceptable level.
[edit] Related articles on Designing Buildings Wiki
- Alterations to existing buildings.
- Building codes.
- Building regulations.
- Change of use class.
- International building code (IBC).
- International Code Council ICC.
- International residential code (IRC).
- International Zoning Code (IZC).
- Permitted development.
- Renovation.
- Structural engineering codes.
- The role of codes, standards and approvals in delivering fire safety.
- What approvals are needed before construction begins.
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.