Horizontal Axis Wind Turbine HAWT
This type of wind turbine is the most common and seen across Europe. In simple terms it is 'a wind turbine whose rotor axis is substantially parallel to the wind flow.' (Wind Energy - The Facts. March 2009. A European project financed by the Intelligent Energy).
In general HAWTs used on an industrial scale, such offshore location are most commonly placed upwind, that is to say that the rotor bladed are positioned in front of the tower to face the wind, with the gear and generation system behind. These upwind HAWTs are most popular as the offer higher energy efficiencies because the wind hits the blades directly as opposed to hitting the mechanism first and then the blades as is the case with downwind turbines. The advantage of down wind turbines is that they can pivot in the direction of the wind by using only the wind, as a sail might do by catching the air behind, upwind turbines need to be mechanically turned to face the wind.
Both upwind and and downwind HAWTs can have varying numbers of blades, normally two or three spaced evenly, but single blade turbines do exist as well as small fan turbines with a higher number of blades spaced evenly around the central nose.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.
Accommodating the Victorian and Edwardian working woman. Book review.
Rethinking passive fire protection in design
PFP demands the same level of design rigour as structure or services.