Furlough
The term ‘furlough’ refers to a leave of absence or the process of granting a leave of absence. It is derived from the Dutch word ‘verlof’ meaning leave of absence. It relates specifically to a temporary absence due to the needs of the employer (although it also sometimes refers to normal leave taken by an employee). Employees may be permitted to seek other temporary employment during the period of the furlough.
The term has historically related predominately to US federal government shutdowns, but it rose to prominence in the UK during the Coronavirus outbreak when there was a requirement to furlough employees for self isolation, or because businesses were unable to operate at their normal capacity due to social distancing requirements or because of supply chain or financial problems.
Under the provisions of the Coronavirus Job Retention Scheme, businesses furloughing staff during the coronavirus outbreak are given financial support by the government for the payment of wages as well as the costs of employer national insurance and pension contributions. In addition, those made redundant after 28 February 2019 can be re-employed and placed on furlough.
[edit] Related articles on Designing Buildings Wiki
- Beyond the pandemic.
- Budget 2020.
- CIOB urges construction industry to share PPE with healthcare providers.
- Coronavirus and force majeure.
- Coronavirus impact survey.
- Coronavirus job retention scheme.
- Coronavirus.
- Designing HVAC to resist harmful pathogenic microorganisms (bacteria and viruses such as influenza and 2019-nCov)
- ECA Survey: Industry remains optimistic despite downturn.
- Hospital isolation rooms.
- January 2021 construction output figures.
- The future of the coronavirus furlough.
- Winter Support 2020 - 2021 packages for businesses.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.






















