Consultant team start-up meeting
A consultant team start-up meeting should be held when members of the consultant team are appointed, before they begin work. It should be chaired by the client and attended by the consultant team. It is possible that consultants will not all be appointed at the same time, so it may be necessary to hold more than one start-up meeting.
The start-up meeting is an opportunity to:
- Introduce the parties to be involved, explain responsibilities and exchange contact details.
- Describe the organisational structure that will be adopted.
- Issue and discuss site information.
- Issue and discuss the preliminary business case (if appropriate).
- Issue and discuss the strategic brief.
- Issue and discuss the project execution plan.
- Agree working methods such as; methods of communication, means for reporting, approvals and decision making processes (consultants can sometimes programme client decisions into their work without first establishing that the programme suits the client), drawing protocols and standards, collaborative practices, document control strategies and so on.
- Discuss procurement options and tendering restrictions (such as OJEU procurement rules).
- Discuss CDM and other legislative obligations.
- Identify any additional members of the consultant team, specialist designers, specialist contractors or independent client advisers who should be appointed.
- Discuss the programme.
- Identify immediate tasks to be undertaken.
- Agree meeting schedules.
- Discuss the application of VAT.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.