The following comprises of comments from people with experience gathering BREEAM evidence
Contents |
[edit] Briefing the Design team
[edit] Contract clauses
- Make sure client team are including BREEAM performance in their appointments, sub-contracts and key reporting criteria for PMs
- Include in your fee proposal and initial reports information on design responsibilities relating to evidence gathering and format/types using the BREEAM evidential requirements section from the manual as a guide.
- Ask the design team to add into the specifications the full list of evidence to be provided by the contractor.
[edit] Assigning responsibilities
- A pre assessment summary report with a summary of the information required from each party
- Set out strong description of what is required for each issue at a very early stage, and keep this in regular discussion, making sure people actually understand what is required and when. Ideally this should be done directly rather than at a big meeting which is often not productive, or the client is present so people nod and say ‘yes i know what im doing’ and then deliver nothing
- Meeting with the full team where all issues are explained and where every team member hears what his responsibilities are. During the meeting everybody writes in the pre assessment report what he is responsible for
- Clear fee scope and an early meeting to discuss and agree design team responsibilities.
[edit] Deadlines
[edit] Documentation
- Prepare a Contractors BREEAM Specification document, an M&E BREEAM spec document and Architects BREEAM spec which describe what is required and when
- Provide schedule of evidence required against each credit and assign responsibilities
[edit] General tips
- Evidence examples and templates are very useful for teams
- Ensure team know how to improve any evidence sent asap, what is good / acceptable and what is not compliant
- Collaborate with the BREEAM AP or other client project owner, throughout the design and construction phases. Indirectly keep BREEAM on the project team’s agenda!
- Praise good evidence so they know they can produce this in the future for further assessments
- Clearly explain that most evidence can be based on “usual” project documents if they contain the information needed.
[edit] Chasing evidence
[edit] Tracking tools
- Online portal through which all project team members can access the
- criteria and provide evidence in real time.
- We use IESTap
- Use shared online spaces for sharing documents and records (Dropbox, OneDrive, etc), ensuring the privacy and correct visibility of each folder for each design team/requirement/theme
- IES TaP or BREEAM TrackerPlus work well
[edit] Progress updates
- Provide regular feedback on the evidence they submit rather than just leaving it so they don’t know where they stand.
- Attend regular meetings to provide updates on the evidence still needed.
- Send out regular evidence trackers - use traffic light system to name and shame the team.
- Regular updated action lists for each project team member confirming exactly what they need to provide.
- Issue regular score update and list containing the typical design/post construction stage evidence required.
- Regular updates and feedback on what has (or hasn’t) been provided.
[edit] General tips
- Setting dates
- A good collaboration with BREEAM AP gives assessors better access to and influence on project team throughout design and construction.
[edit] Find out more
[edit] Related articles
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Multiple Author Article 16:27, 19 Apr 2018 (BST)
Featured articles and news
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.