As-built performance
The final stage impact assessment of the Future Buildings Standard. Secondary legislation, statutory guidance published by MHCLG 24 March, 2026 defines as-built performance as being "The actual energy performance of a building once it has been constructed and commissioned, which may differ from performance estimated at the design stage."
The term is also used to describe complete drawings of a finished buildings, though the intention of these is similar and at a similar stage the content and outcome is different. See article as-built drawings and record drawings.
For further information and details from the perspective of performance see performance gap between building design and operation, closing the gap between design and as-built performance, post occupancy evaluation., building use studies (BUS), building performance evaluation, performance in use and more.
[edit] Related articles on Designing Buildings
- Appointing consultants.
- As-built drawings and record drawings.
- Building performance evaluation.
- Building performance metrics.
- Closing the gap between design and as-built performance.
- Energy audit.
- Maintenance.
- Performance of exemplar buildings in use: Bridging the performance gap FB 78.
- Performance in use.
- Post occupancy evaluation.
- Post occupancy evaluation process.
- Sick building syndrome.
- Thermal comfort.
- Wellbeing.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Sir Edwin Lutyens: Britain's greatest architect? Book review.
CIOB publishes free template to help assess and manage risks.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.

















