User contributions
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
- 16:22, 31 October 2011 (diff | hist) Adjudication in construction contracts
- 16:17, 31 October 2011 (diff | hist) Building regulations
- 15:45, 31 October 2011 (diff | hist) Get started - top tips and help
- 15:21, 31 October 2011 (diff | hist) Traditional contract: business justification
- 15:20, 31 October 2011 (diff | hist) N Category:Traditional contract (Created page with "Category:Free_Work_Plans") (top)
- 15:20, 31 October 2011 (diff | hist) Traditional contract: outline work plan
- 14:51, 31 October 2011 (diff | hist) Environmental impact assessment EIA
- 14:48, 31 October 2011 (diff | hist) Detailed planning application
- 14:47, 31 October 2011 (diff | hist) Appointing consultants for building design and construction
- 14:05, 31 October 2011 (diff | hist) N Management structure for construction clients (Created page with "The management structure describes how the client intends to organise itself for the proposed project: *Appint a project director (senior responsible owner in the public sector)...")
- 13:19, 31 October 2011 (diff | hist) N Management contractor (Created page with "See also management contract: oultine work plan. Management contracting is a procurement route in which the works are constructed by a number of different works contractors who ...")
- 13:14, 31 October 2011 (diff | hist) N Loss and expense (Created page with "Construction contracts will generally provide for the contractor to claim direct loss and/or expense that has resulted by the progress of the works being materially affected by r...")
- 13:08, 31 October 2011 (diff | hist) N Legal agreements for design and construction (Created page with "Listed below are the draft heads of terms for likely legal agreements: *Procurement and contract strategy with carefully thought out risk allocation (many of these methods can b...")
- 12:51, 31 October 2011 (diff | hist) m Construction contract (moved Contracts to Contract)
- 12:50, 31 October 2011 (diff | hist) N Lead designer (Created page with "The role of lead designer is identified in some forms of contract and appointment such as: *[http://www.cic.org.uk/activities/liabilityCC.shtml The Construction Industry Council...")
- 12:44, 31 October 2011 (diff | hist) N Latent defects (Created page with "It is the nature of construction projects that faults and defects caused by failures in design, workmanship or materials, may not become apparent or readily detectable (even with...")
- 12:40, 31 October 2011 (diff | hist) N Liquidated damages in construction contracts (Created page with "Liquidate damages (or liquidated and ascertained damages) are not penalties, they are pre-determined damages set at the time the contract is entered into based on a calculation o...")
- 12:37, 31 October 2011 (diff | hist) N Lead consultant for building design (Created page with "The role of lead consultant is identified in some forms of appointment such as: *[http://www.cic.org.uk/activities/liabilityCC.shtml The Construction Industry Council (CIC) cond...")
- 12:32, 31 October 2011 (diff | hist) N Key performance indicators KPI (Created page with "Key performance indicators can be used to: *Monitor costs. *Track progress. *Assess client satisfaction. *Identify strengths & weaknesses. *Compare performance across and be...")
- 12:29, 31 October 2011 (diff | hist) N Invitation to negotiate for PFI (Created page with "The invitation to negotiate for private finance initiative (PFI) projects is equivalent to the invitation to tender for traditional contracts. It sets out the project particulars...")
- 12:25, 31 October 2011 (diff | hist) N Invitation to tender for construction contracts (Created page with "An invitation to tender is a formal invitation to make an offer for the supply of goods or services. An invitation to tender might be issued for a range of contracts, including: ...")
- 12:18, 31 October 2011 (diff | hist) N Investment decision maker for building design and construction (Created page with "On publicly-funded projects following the [http://webarchive.nationalarchives.gov.uk/20100503135839/http://www.ogc.gov.uk Office of Government Commerce ](OGC) ( now part of the n...")
- 11:51, 31 October 2011 (diff | hist) Management contract: outline work plan
- 11:47, 31 October 2011 (diff | hist) Management contract: outline work plan
- 11:45, 31 October 2011 (diff | hist) Traditional contract: outline work plan
- 11:41, 31 October 2011 (diff | hist) Traditional contract: outline work plan
- 11:40, 31 October 2011 (diff | hist) Public project: outline work plan
- 11:38, 31 October 2011 (diff | hist) Public project: outline work plan
- 11:32, 31 October 2011 (diff | hist) Traditional contract: outline work plan
- 11:26, 31 October 2011 (diff | hist) Construction management: outline work plan
- 11:24, 31 October 2011 (diff | hist) Management contract: outline work plan
- 11:18, 31 October 2011 (diff | hist) N Category:Management contract (Created page with "Category:Free_Work_Plans") (top)
- 11:16, 31 October 2011 (diff | hist) N Management contract: outline work plan (Created page with "An outline work plan for a project following a management contract procurement route is presented below. Clicking on any of the stages will open up the detailed tasks which the i...")
- 11:11, 31 October 2011 (diff | hist) N Category:Construction manager (Created page with "Category:Free_Work_Plans") (top)
- 11:10, 31 October 2011 (diff | hist) N Construction management: outline work plan (Created page with "An outline work plan for a project following a construction management / management contract procurement route is presented below. Clicking on any of the stages will open up the ...")
- 10:54, 31 October 2011 (diff | hist) N Category:Design and build (Created page with "Category:Free_Work_Plans") (top)
- 10:52, 31 October 2011 (diff | hist) Design and build: outline work plan
- 10:51, 31 October 2011 (diff | hist) N Design and build: outline work plan (Created page with "An outline work plan for a design and build procurement route (in the private sector) is presented below. Clicking on any of the stages will open up the detailed tasks which the ...")
- 10:35, 31 October 2011 (diff | hist) Public project: business justification
- 10:35, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:30, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:28, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:24, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:21, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:20, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:15, 31 October 2011 (diff | hist) Public project: outline work plan
- 10:11, 31 October 2011 (diff | hist) m Appointing consultants for building design and construction (moved Appointments to Appointment)
- 10:08, 31 October 2011 (diff | hist) Public project: business justification
- 10:07, 31 October 2011 (diff | hist) Public project: business justification
- 10:05, 31 October 2011 (diff | hist) Public project: business justification
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
Featured articles and news
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.