Modular vs traditional construction
This article provides an outline of the important differences between modular and traditional construction methods:
- The term ‘traditional’ is often used to describe the types of linear construction, where each individual step is not only constructed entirely (or largely) on site, but also needs to be completed before the project can move on to the next phase.
- Modular construction is an off-site based construction method, during which individual components are manufactured (or ‘prefabricated’) in a factory, transported to the site entirely (or mostly) complete and assembled on location.
Both construction methods start in the same way – planning, design, approvals, site preparation and development. From that point forward, however, the differences begin:
Image source: Modscape
Pros and Cons of Modular Construction
Pros:
- Thanks to the ability for the project to run simultaneously on-site and in-factory, modular construction can be up to 50% quicker than traditional construction.
- As major parts of construction are handled within a factory, weather conditions are often irrelevant during the majority of the project.
- The factory-based manufacturing process allows not only for greater quality control during the manufacturing process but for many health and safety risks to be considerably reduced, if not eliminated,
- The process aims to minimise waste and reduce the project’s carbon footprint, as fewer people are travelling to the site and modules are produced directly to spec using Computer Aided Manufacturing.
- The impact on the community surrounding the construction site can be significantly reduced, due to much lower levels of noise and traffic during the project period
- The methods employed in modular construction can often benefit the energy efficiency and airtightness of the final construction
Cons:
- Access to the site must be considered from the very beginning, as it will need to allow for the delivery of large modules.
- Traditional construction allows for later design changes, while modular construction is unlikely to be able to factor these in, so early complete design sign off is crucial with clients.
- The logistics and planning of individual module assembly will need rigorous planning to ensure a smooth project.
Ultimately, each project should be considered individually. The method that is selected should match the ultimate desired outcome and the individual limitations of each project.
Featured articles and news
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Comments