Wireless electric highways
In September 2014, Highways England (then known as the Highways Agency) began a feasibility study to investigate dynamic battery charging systems for electric vehicles (EV). Such a system would allow drivers of ultra-low emission vehicles to travel long distances on the strategic road network without needing to stop and charge. Ref Highways England.
The Highways Agency suggested that there is a continued move towards the introduction of wireless charging as an addition to the standard plug in charging infrastructure for electric vehicles. The feasibility study was intended to investigate potential solutions that might:
- Mitigate against EV’s running out of power.
- Help reduce fuel costs.
- Have minimum impact on the road surface in terms of installation and maintenance.
- Help achieve better air quality.
- Reduce noise levels.
- Reduce pollution from tailpipe emissions.
It was also expected to asses financial charging mechanisms for energy received by EV owners and to Identify additional services that could be introduced at the same time.
In August 2015, the government announced that following the completion of the feasibility study, off road trials of dynamic wireless power transfer technologies to support electric and hybrid vehicles would take place later in the year. Ref Gov.uk.
Transport Minister Andrew Jones said, “The potential to recharge low emission vehicles on the move offers exciting possibilities. The government is already committing £500 million over the next five years to keep Britain at the forefront of this technology, which will help boost jobs and growth in the sector.”
Highways England Chief Highways Engineer Mike Wilson said, “The off road trials of wireless power technology will help to create a more sustainable road network for England and open up new opportunities for businesses that transport goods across the country.”
The trials are expected to last 18 months and will involve fitting vehicles with wireless technology and replicating motorway conditions. They may be followed by on road trials.
Featured articles and news
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.