Preassembly
Pre is a prefix meaning before, so to preassembly or pre-assembly refers to assembling something before or in advance.
In construction terms PAS 1192-2:2013: Specification for information management for the capital/delivery phase of construction projects using building information modelling (BIM), defines assembly as: 'Group of components or types to enable the reuse of standardised design or specification elements improving productivity of design and delivery as well as providing a location to hold specifications and lessons learnt in a simple and useable way. They may hold benchmark data for cost and carbon impacts. The contents of assemblies may themselves have attributes and classifications. These properties may include key data which is attached (to the object) for use once it is placed into a model and may include cost, CO2, programme, maintenance and other key information.'
So pre-assembly in design and construction terms refers to elements of a building that have been assembled in advance, prior to being installed in the building. Some common examples of this might be where a bathroom unit might be pre-assembled with sanitary units already fitted and plumbed to be lifted into place by crane, or similarly, a group of structural members such as a roof truss that is pre-assembled and lifted into place on a roof.
Unassembled would refer to the prepared parts that have not yet been put together, unassembly per se is not a word.
[edit] Related articles on Designing Buildings
Featured articles and news
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.