Pre-tender interview
When selecting suppliers to design, construct and perhaps operate a development, an initial short-list of prospective tenders may be invited to attend pre-tender interviews before they are invited to tender.
A pre-tender interview is an opportunity to:
- Assess the tenderers understanding of the commission.
- Assess the tenderers likely approach to the project.
- Assess the tenderers current workload.
- Assess the tenderers enthusiasm.
- Clarify ambiguities on either side.
- Verify that the proposed timescale for the tender process is achievable.
- Verify that the proposed nature of the tender process will obtain the best results.
Price does not feature in the pre-tender interviews as tender documents have yet to be issued.
Discussions held during the interviews may result in changes being made to the tender documents or to the length of the tender period. It can be in the interest of the client to make these changes as it ensures that they get the best value and most accurate tenders possible.
Interviews may include presentations by prospective tenderers, followed by questions from a small panel. The panel should agree in advance the nature of questions to be asked of each consultant (perhaps based on an assessment of their pre-qualification questionnaires). Answers may be scored and weighted, and sufficient time allowed between interviews for scores to be compiled and considered. This allows an objective appraisal to take place and also allows a consensus opinion to be formed, rather than having decisions driven by a single person.
Pre-tender interviews should be carefully managed so that tenderers are not made aware of who the other tenderers are, as this may impact on the competitiveness of the tenders they submit. This may include arrangements in relation to timing, car parking, waiting rooms and signing in books as well as the removal of any materials left by at the interviews by tenderers.
If the pre-tender interviews reveal that one or more prospective candidates are unsuitable, the initial shortlist may be reduced and the remaining candidates invited to tender.
It may also be appropriate to hold mid-tender interviews.
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Construction contract.
- Contract documents.
- How to prepare tender documents.
- Mid-tender interviews.
- Pre-qualification questionnaire.
- Procurement route.
- Tender.
- Tender documents
- Tender negotiations.
- Tender settlement meeting.
[edit] External references
- PACE Guidance on the Appointment of Contractors and Consultants p 481 (for contractors) and p303 (for consultants).
- OGC Tendering process for consultancy support.
Featured articles and news
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.