Peninsula Place
On 2 February 2017, designs were revealed for Peninsula Place, a major new development planned for Greenwich Peninsula in London.
Designed by the Spanish architect Santiago Calatrava, his first work in the UK, the project is budgeted at £1 billion.
Developed by Knight Dragon, the scheme involves three tapering towers arranged like a crown and rising to 30-storeys, and including a 24 m (80 ft)-high winter garden, and a 152 m (500 ft)-long glass galleria. The project will also feature a tubular bridge with latticed sides linking it to the Thames.
The towers will rise above the tube and bus station, a theatre, cinema, bars, shops, hotel, a new performance venue, and up to 28,000 sq. m of office space. The idea is that people will emerge from the tube station into the glazed winter garden.
Peninsula Place forms part of regeneration projects on the site totaling £8.4 billion, masterminded by Allies and Morrison. They intend to design two residential blocks which, together with Calatrava’s towers, will contain 800 homes. However, only 200 of these will be ‘affordable’.
At the official unveiling, Knight Dragon Chief Executive Richard Margree said they aim to start work on the scheme either at the end of 2017 or beginning of 2018, with completion in 2021.
Calatrava said: "It is an honour to be designing such a piece of the fabric of London, a city I love. In designing this scheme, I have been inspired by London's rich architectural heritage and the very special geography of the Peninsula."
Despite being labeled a ‘starchitect’, he has received something of a reputation for his projects spiraling far beyond their original budget and schedule. Most recently, The Oculus in New York was completed $2bn over-budget.
Content and images courtesy of Knight Dragon.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.