Maintenance contractor’s management and administration
The New Rules of Measurement (NRM) are published by the Royal Institute of Chartered Surveyors (RICS). They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects.
According to NRM3: Order of cost estimating and cost planning for building maintenance works, the term ‘maintenance contractor’ (or prime contractor) refers to:
‘…the contractor responsible for the total maintenance and completion process. The term Prime contractor is often used to mean the Main contractor in central government and the defence sector..
Maintenance contractor’s management and administration are:
‘…items that cannot be allocated to a specific element, sub-element or component. These include the costs associated with management and staff, site establishment, temporary services, security, safety and environmental protection, control and protection, commonly used plant and equipment, relevant temporary works, the maintenance of site records, completion and post-completion requirements, waste disposal, fees and charges, sites services and insurances, bonds, guarantees and warranties. These exclude costs associated with subcontractor’s or work package contractor’s management and administration costs.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.