Arbour
There are two construction related definitions of the term, ‘arbour’.
One usage of the word is related to garden buildings or structures. In this context, an arbour is an element found in a park, garden or other landscaped area. Arbours are primarily constructed using branches and leaves, and they may be covered with crawling vines. They are sometimes supported by latticework or some other framework and may be positioned at the entrance to a path or garden.
Another type of arbour is one associated with lifting or rigging mechanisms such as theatrical applications. These systems are often part of operational devices used to lift components (such as lights, curtains, scenery and even people) on and around the stage. A counterweight arbour is a common type.
An arbour pit is part of the stage that accommodates the counterweight arbour. This confined space may have limited or restricted means of entry or exit, and poses a health hazard both from its spatially restricted nature and access to and from it, or from the materials and objects that may be encountered.
[edit] Related articles
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.