Sacrificial timber
The term ‘sacrificial timber’ refers to timber in a structural assembly that is intentionally oversized in order to enhance its fire resistance. Timber burns at a regular and measurable rate, so exposed timber sections can be designed with an additional 'sacrificial' element (ie increased width and/or depth) that will char slowly and protect the inner, structural timber from fire damage.
Sacrificial timber can be a design solution if a solid timber member is to be exposed – either fully or partly – or if full fire resistance cannot be provided by plasterboard (or other) fire insulating materials.
The outer surface of a timber element will typically char in a fire, with temperatures in excess of 350°C necessary for flaming to occur. The charred portion of the timber then acts as an insulator and, although some will be irreparably damaged (or ‘sacrificed’), the core timber retains its stability and structural integrity.
The density, and therefore the charring rate, of the timber element will determine the required quantity of sacrificial timber. BS EN 1995-1-2:2004 provides charring rates for different timber materials for the purposes of informing initial design.
Notional charring rates (the charring rates apply to each face exposed to fire):
MATERIAL | CHARRING RATE ßn (mm/min) |
Softwood timber | 0.8 |
Softwood glulam and laminated veneer lumber (LVL) | 0.7 |
Hardwood timber and hardwood glulam | 0.55 |
For example, if a softwood element is exposed on all four of its sides to 20 minutes of fire:
2 x 20 x 0.8 = 32 mm
The width and depth of the element would require 32 mm of sacrificial timber.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.