Modelling building construction durations in Nigeria
Hassan Ahmadu, Ahmadu Bello University, Nigeria.
There is now widespread acceptance in the research community that time prediction models for construction projects should take time-influencing qualitative and managerial factors into consideration. Consequently, several multivariate models combining project scope with these factors have been developed. However, the literature also points to the limitations of these models: their application is only effective in the regions and countries where they were developed. This study aims to develop a multivariate time prediction model that is suitable for the Nigerian construction industry. A self-administered questionnaire was used to source information on the project scope factors and qualitative and managerial factors that should be considered in the study.
Principal component regression was used for the data analysis and model development, using SPSS 16.0 for windows. Three models were developed; two of them - for the public and private sector - had high R2 values. Through testing and validation they were found to be suitable for predicting construction time. By contrast, the third model, which covered all projects, had a low R2 value and was found to be an unsuitable prediction tool. The models with high R2 values serve as a useful tool to help project managers and contractors predict construction time, thereby facilitating effective planning.
This dissertation won the Merit Award, Masters Dissertation Award, CIOB International Innovation & Research Award, 2014.
The judges said, “A well-written dissertation which is tightly written and nicely argued. It draws from a broad and authoritative literature review to frame the research question in an exemplary way. It has a diligent and statistically-rigorous analysis of quantitative data gleaned from a well-designed questionnaire survey. It is an excellent piece of work and is well deserving of international recognition.”
--CIOB
Featured articles and news
Types of rapidly renewable content
From forestry to agricultural crops and their by-products.
Terraced houses and the public realm
The discernible difference between the public realm of detached housing and of terraced housing.
Put digitalisation and sustainability at the core of curricula
Project management educators are urged.
Looking back at the influence of climate events
From a designer and writer: 'There are limits to growth but no limits to development'.
Terms, histories, theories and practice.
Biophilic design and natural light
Letting in the light and natural elements into spaces.
APM Programme Management Conference 2024
Strategies for Success.
Residential takes the reins as contract awards even out
Contracts down, but remain above the last quarter of 2023.
Celebrating Eid and the largest mud-brick building.
Barry Kingscote claims prestigious CIOB CMYA Award.
The British Mosque: an architectural and social history
The story of some 1,500 mosques or more in Britain.
Heat pump refrigerants, efficiencies and impacts
R12 to R1270 what are the differences?
Global heat pump market in 2023
Challenging times with positive but modest outlook.
Beyond the infrastructure pipeline
Opportunities and chokepoints.