Groundwater control
The ICE manual of geotechnical engineering: Volume II was published by The Institution of Civil Engineers (ICE) in January 2012. It was written by Dr Martin Preene.
In Chapter 80 Groundwater control (pages 1173-1190), the manual defines groundwater control as: “...the range of temporary works techniques used to allow below-ground construction projects to be carried out in dry and stable conditions. Two principal approaches can be used: groundwater control by pumping (also known as construction dewatering), which involves pumping from an array of wells or sumps to lower groundwater levels in the vicinity of an excavation; or groundwater control by exclusion, which relies on low permeability cut-off walls around the excavation to prevent or reduce groundwater inflows."
[edit] Related articles on Designing Buildings
- Dewatering.
- Groundwater.
- Groundwater control in urban areas.
- Hydrogeological Impact Appraisal HIA.
- Pumps and dewatering equipment.
- Raising awareness of dewatering regulation.
- River engineering.
- Water engineering.
[edit] External resources
- Institution of Civil Engineers, ICE manual of geotechnical engineering: Volume II by Dr Martin Preene (subscription required for full access).
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.