Green fit-out agreement
BREEAM UK New Construction, Non-domestic Buildings (United Kingdom), Technical Manual, SD5078: BREEAM UK New Construction 2018 3.0, published by BRE Global Limited, defines a green fit-out agreement as:
‘A formal contractually binding agreement between a building developer or owner and their tenants. As such, a green fit-out agreement (or ‘green’ clauses or sections in a lease agreement) can be used as evidence demonstrating compliance with the relevant BREEAM issue criteria at the interim design and final post-construction stages of assessment. The agreement should make specific reference to the specification requirements or levels claimed, and as defined by BREEAM in this technical manual, where credits are awarded. BREEAM aims to encourage a mutually beneficial relationship between the shell and core developer or owner of a building and its future tenants so that the fully fitted operational building achieves performance against the highest possible environmental standards. In order to achieve this, BREEAM encourages and rewards the use of formal legally binding green fit-out agreements between a developer or owner and their tenant. Where a legally binding green fit-out agreement is provided as evidence and it commits the tenant’s fit-out to meet the criteria of this BREEAM issue, credits are available to be awarded.’
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Gov.uk - Hot-rolled steel plate
New anti-dumping measure imposed on South Korea.
ECA responds to the Milburn Report
Youth employment to be linked to workforce demand.
The construction industry urgently needs to attract new talent
CIOB responds to Neets report.
Grenfell Tower community update
Memorial columns to be retained as careful dismantling continues.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.
Post-War Homes: mid-century British architecture. Book review.
CIAT reflects on the party conferences.
CIOB announce the winners of the Art of Building photography competition.
















