Design metrics
The RIBA Passivhaus Overlay, published by the RIBA in 2022, states in relation to design metrics: “To inform the design process each building type and site will have an optimal range of useful Design Metrics, generally including, although not limited to, parameters such as form factor, glazing ratio, ventilation rate, length of intake/exhaust ductwork, internal gains etc. Each building typology has an optimal range of factors, ratios, rates etc. and thus early prototyping and options analysis by means of the PHPP model during RIBA Stages 1 and 2 helps the design team to identify and develop these metrics so that the design process can be expedited, costly redesign can be avoided, and construction budgets can be met.”
[edit] Related articles on Designing Buildings
Featured articles and news
Councils and communities highlighted for delivery of common-sense housing
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.