User contributions
(Latest | Earliest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)
- 11:16, 10 January 2024 (diff | hist) N File:Questions to check if a process needs improvement (Statz, 2005).png (top)
- 11:04, 10 January 2024 (diff | hist) N File:Continuous, Continual, and Process Improvement- an example.png (top)
- 11:01, 10 January 2024 (diff | hist) N File:Continuous, Continual, and Process Improvement.png (top)
- 10:58, 10 January 2024 (diff | hist) N File:Continuous Vs. Continual Improvement.png (top)
- 10:54, 10 January 2024 (diff | hist) N File:Link among QI, PI, and CI (Matthews, 2015).png (top)
- 09:58, 10 January 2024 (diff | hist) N Digital transformation (Created page with "= Introduction = Terms like “digital” have been part of the common language for the past decades. In the construction sector where tradition and new technologies do not alwa...")
- 09:37, 10 January 2024 (diff | hist) N File:Process Model to build Dynamic Capabilities for Digital Transformation (Warner & Wäger, 2018).png (top)
- 09:36, 10 January 2024 (diff | hist) N File:Merschbrock et al- selecting solutions.png (top)
- 09:35, 10 January 2024 (diff | hist) N File:Digital Transformation Index 2020.png (top)
- 09:34, 10 January 2024 (diff | hist) N File:Dell's benchmark groups for its Digital Transformation Index.png (top)
- 09:33, 10 January 2024 (diff | hist) N File:Effects of the transformation.png (top)
- 09:32, 10 January 2024 (diff | hist) N File:Martec's Law- what if a cataclysmic event happens.png (top)
- 09:30, 10 January 2024 (diff | hist) N File:Martec's Law- agile organisations.png (top)
- 09:29, 10 January 2024 (diff | hist) N File:Martec's Law by Scott Brinker.png (top)
- 08:11, 10 January 2024 (diff | hist) User:ConSIG CWG
- 16:12, 9 January 2024 (diff | hist) Quality in the Nuclear sector
- 15:54, 9 January 2024 (diff | hist) m Quality in the Nuclear sector (Protected "Quality in the Nuclear sector" ([edit=author] (indefinite)))
- 15:47, 9 January 2024 (diff | hist) Quality in the Nuclear sector
- 15:43, 9 January 2024 (diff | hist) Quality in the Nuclear sector
- 15:42, 9 January 2024 (diff | hist) Quality in the Nuclear sector
- 15:41, 9 January 2024 (diff | hist) N Quality in the Nuclear sector (Created page with "Quality in the Nuclear sector Contents Introduction. 2 Safety and Quality Introduction. 3 Nuclear Safety. 6 [[#_Toc1...")
- 15:33, 9 January 2024 (diff | hist) N File:Structure of the QCPs and the ITPs in a hypothetical project.png (top)
- 15:32, 9 January 2024 (diff | hist) N File:A high-level illustration of connections between quality assurance, quality control and the management system of nuclear facilities..png (top)
- 15:32, 9 January 2024 (diff | hist) N File:Evolution of the IAEA approach to quality, leadership and management showing the organizational management system and detailed quality requirements levels. (IAEA, 2020).png (top)
- 15:31, 9 January 2024 (diff | hist) N File:Hierarchy of legal requirements, regulations and standards and the bodies issuing them (IAEA, 2020).png (top)
- 15:30, 9 January 2024 (diff | hist) N File:Stakeholder Engagement (NucSig, 2013).png (top)
- 15:29, 9 January 2024 (diff | hist) N File:Mortality rate worldwide in 2012, by energy source - in deaths per thousand terawatt hour.png (top)
- 15:27, 9 January 2024 (diff | hist) N File:Deaths from Fukushima (Estimates) (Ritchie et al., 2020).png (top)
- 15:26, 9 January 2024 (diff | hist) N File:Deaths from Chernobyl (Estimates) (Ritchie et al., 2020).png (top)
- 15:25, 9 January 2024 (diff | hist) File:Nuclear accidents worldwide from 1957 to 2011 rated by the INES scale.png (uploaded a new version of "File:Nuclear accidents worldwide from 1957 to 2011 rated by the INES scale.png") (top)
- 15:24, 9 January 2024 (diff | hist) N File:Nuclear accidents worldwide from 1957 to 2011 rated by the INES scale.png
- 11:20, 7 December 2023 (diff | hist) File:Demo image 1.png (top)
- 11:17, 7 December 2023 (diff | hist) N File:Demo image 1.png
- 10:42, 7 December 2023 (diff | hist) Test article
- 10:41, 7 December 2023 (diff | hist) Test article
- 10:17, 11 June 2023 (diff | hist) Why should quality be important to the construction industry?
- 11:20, 24 January 2023 (diff | hist) User:ConSIG CWG
- 11:02, 9 November 2022 (diff | hist) User:ConSIG CWG
- 10:38, 8 November 2022 (diff | hist) User:ConSIG CWG
- 10:31, 8 November 2022 (diff | hist) User:ConSIG CWG
- 13:31, 7 November 2022 (diff | hist) User:ConSIG CWG
- 13:27, 7 November 2022 (diff | hist) User:ConSIG CWG
- 22:38, 24 October 2022 (diff | hist) Risk assessment: a quality perspective
- 22:35, 24 October 2022 (diff | hist) Risk assessment: a quality perspective
- 22:33, 24 October 2022 (diff | hist) N Risk assessment: a quality perspective (Created page with "= 1. Introduction = There are many types of risk, e.g. financial, design, health & safety, environmental and quality. In this article, the author focuses on quality risks an...")
- 08:52, 21 August 2022 (diff | hist) User:ConSIG CWG
- 07:58, 1 August 2022 (diff | hist) Off-Site Manufacturing
- 07:58, 1 August 2022 (diff | hist) Off-Site Manufacturing
- 07:55, 30 July 2022 (diff | hist) Interpersonal Relationships in Auditing
- 07:51, 30 July 2022 (diff | hist) Interpersonal Relationships in Auditing
- 21:26, 29 July 2022 (diff | hist) Interpersonal Relationships in Auditing
- 21:25, 29 July 2022 (diff | hist) Interpersonal Relationships in Auditing
- 21:10, 29 July 2022 (diff | hist) m Interpersonal Relationships in Auditing (Protected "Interpersonal Relationships in Auditing" ([edit=author] (indefinite)))
- 21:09, 29 July 2022 (diff | hist) N Interpersonal Relationships in Auditing (Created page with "= Interpersonal Relationships in Auditing = == Introduction == == The “OK Auditor” == There has always been a debate, Nature versus Nurture; were you borne with a behaviou...")
- 20:57, 29 July 2022 (diff | hist) N File:Picture 3.png (top)
- 20:56, 29 July 2022 (diff | hist) N File:Picture 2.png (top)
- 20:55, 29 July 2022 (diff | hist) File:Picture 1.png (uploaded a new version of "File:Picture 1.png") (top)
- 20:49, 29 July 2022 (diff | hist) N File:Picture 1.png
- 17:08, 29 July 2022 (diff | hist) Off-Site Manufacturing
- 16:53, 29 July 2022 (diff | hist) Off-Site Manufacturing
- 16:49, 29 July 2022 (diff | hist) m Off-Site Manufacturing (Protected "Off-Site Manufacturing" ([edit=author] (indefinite)))
- 16:48, 29 July 2022 (diff | hist) Off-Site Manufacturing
- 16:31, 29 July 2022 (diff | hist) N Off-Site Manufacturing (Created page with "= OFF-SITE MANUFACTURING = == 1. EXECUTIVE SUMMARY == The Quality Professional entering the world of off-site manufacturing will be faced with a different and sometimes bewilde...")
- 18:39, 26 March 2022 (diff | hist) Design Best Practice Self-Assessment Tool (top)
- 18:39, 26 March 2022 (diff | hist) Design Best Practice Self-Assessment Tool
- 18:28, 26 March 2022 (diff | hist) Design Best Practice Self-Assessment Tool
- 18:27, 26 March 2022 (diff | hist) Design Best Practice Self-Assessment Tool
- 18:25, 26 March 2022 (diff | hist) Design Best Practice Self-Assessment Tool
- 18:22, 26 March 2022 (diff | hist) Design Best Practice Self-Assessment Tool
- 18:20, 26 March 2022 (diff | hist) Design Best Practice Self-Assessment Tool
- 18:19, 26 March 2022 (diff | hist) Design Best Practice Self-Assessment Tool
- 18:17, 26 March 2022 (diff | hist) Design Best Practice Self-Assessment Tool
- 10:34, 7 March 2022 (diff | hist) User:ConSIG CWG
- 22:03, 1 March 2022 (diff | hist) Successful Audits - Techniques for Everyone
- 22:01, 1 March 2022 (diff | hist) Successful Audits - Techniques for Everyone
- 21:56, 1 March 2022 (diff | hist) Successful Audits - Techniques for Everyone
- 21:56, 1 March 2022 (diff | hist) Successful Audits - Techniques for Everyone
- 21:54, 1 March 2022 (diff | hist) Successful Audits - Techniques for Everyone
- 21:50, 1 March 2022 (diff | hist) Successful Audits - Techniques for Everyone
- 21:42, 1 March 2022 (diff | hist) Successful Audits - Techniques for Everyone
- 21:40, 1 March 2022 (diff | hist) Successful Audits - Techniques for Everyone
- 21:37, 1 March 2022 (diff | hist) N Successful Audits - Techniques for Everyone (Created page with "= Summary = People can have preconceived ideas about audits often thinking of them as something to be avoided at all costs. However, auditing, if it is done correctly, is actual...")
- 19:33, 1 March 2022 (diff | hist) User:ConSIG CWG
- 19:08, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 19:07, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 19:02, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:59, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:59, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:57, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:51, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:46, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:44, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:42, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:40, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:33, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:25, 30 January 2022 (diff | hist) Value Stream Mapping in the Construction Industry
- 18:21, 30 January 2022 (diff | hist) N Value Stream Mapping in the Construction Industry (Created page with "= An Introduction to Value Steam Mapping (VSM) = VSM is one of the components of Lean Manufacturing. Elizar et al. [3] define Value Stream Mapping (VSM) as “a meth...")
- 18:18, 30 January 2022 (diff | hist) N File:102.5 VSM Picture3.png (top)
- 18:17, 30 January 2022 (diff | hist) N File:102.5 VSM Picture2.PNG (top)
- 18:10, 30 January 2022 (diff | hist) N File:102.5 VSM Picture1.png (top)
- 18:23, 22 January 2022 (diff | hist) User:ConSIG CWG
- 18:22, 22 January 2022 (diff | hist) N The Building Safety Bill - A Quality Response (Created page with "= Introduction = Every construction problem has a quality issue as one of its root causes. Poor contract conditions, failure to implement robust test regimes and inspection plan...")
- 18:16, 22 January 2022 (diff | hist) N File:114 BuildingSafetyFill Pic2.png (top)
- 18:16, 22 January 2022 (diff | hist) N File:114 BuildingSafetyFill Pic1.png (top)
- 09:28, 28 October 2021 (diff | hist) User:ConSIG CWG
- 11:09, 26 October 2021 (diff | hist) Quality Benchmarks - A Construction Perspective
- 10:56, 26 October 2021 (diff | hist) N Quality Benchmarks - A Construction Perspective (Created page with "= Executive Summary = Following the tragic fire at London’s Grenfell Tower in 2017, there is greater scrutiny of the industry’s approach to Quality Control and how buildings...")
- 10:43, 26 October 2021 (diff | hist) N File:Benchmarking Figure 2 Process Map.png (top)
- 10:38, 26 October 2021 (diff | hist) N File:Benchmarking Figure 1.png (top)
- 14:26, 16 October 2021 (diff | hist) Anti-bribery and Ethics - A Construction Perspective
- 14:25, 16 October 2021 (diff | hist) N Anti-bribery and Ethics - A Construction Perspective (Created page with "= Aim = The purpose of this article is threefold: # To provide a background as to why anti-bribery and ethical considerations are relevant in construction; # To present anti-br...")
- 14:20, 16 October 2021 (diff | hist) N File:Anti-BriberyProcess.jpg (top)
- 22:40, 16 May 2021 (diff | hist) Design Best Practice Self-Assessment Tool
- 22:39, 16 May 2021 (diff | hist) Design Best Practice Self-Assessment Tool
- 22:36, 16 May 2021 (diff | hist) User:ConSIG CWG
- 22:32, 16 May 2021 (diff | hist) Design Best Practice Self-Assessment Tool
- 22:30, 16 May 2021 (diff | hist) N Design Best Practice Self-Assessment Tool (Created page with "= --ConSIG CWG 23:30, 16 May 2021 (BST) = = Background = Typically today: * Construction projects have many quality metrics for the delivery phase but Clie...")
- 09:56, 8 April 2021 (diff | hist) Value management in building design and construction (top)
- 09:55, 8 April 2021 (diff | hist) Logistics management in construction
- 09:55, 8 April 2021 (diff | hist) Just in time (top)
- 09:55, 8 April 2021 (diff | hist) Agile construction
- 09:55, 8 April 2021 (diff | hist) Lean Six Sigma in the construction industry
- 09:54, 8 April 2021 (diff | hist) Mean lean green
- 09:54, 8 April 2021 (diff | hist) Lean construction
- 09:52, 8 April 2021 (diff | hist) Lean Construction - A Quality Perspective
- 09:48, 8 April 2021 (diff | hist) User:ConSIG CWG
- 17:58, 20 March 2021 (diff | hist) Lean Construction - A Quality Perspective
- 17:57, 20 March 2021 (diff | hist) Lean Construction - A Quality Perspective
- 17:56, 20 March 2021 (diff | hist) Lean Construction - A Quality Perspective
- 17:49, 20 March 2021 (diff | hist) Lean Construction - A Quality Perspective
- 17:45, 20 March 2021 (diff | hist) N Lean Construction - A Quality Perspective (Created page with "= Introduction = The integration of lean into the construction industry has been growing rapidly over the last few years as more and more contractors have begun to understand th...")
- 17:40, 20 March 2021 (diff | hist) N File:Core Principles of Lean.jpg (top)
- 17:40, 20 March 2021 (diff | hist) N File:Lean Wastes.png (top)
- 13:52, 7 November 2020 (diff | hist) Structural steelwork: a quality perspective
- 22:24, 18 October 2020 (diff | hist) Temporary Works Design - A Quality Management Perspective
- 22:23, 18 October 2020 (diff | hist) User:ConSIG CWG
- 22:20, 18 October 2020 (diff | hist) How to check certification (e.g. ISO 9001, ISO 45001, UKAS etc.)
- 22:17, 18 October 2020 (diff | hist) How to check certification (e.g. ISO 9001, ISO 45001, UKAS etc.)
- 22:15, 18 October 2020 (diff | hist) How to check certification (e.g. ISO 9001, ISO 45001, UKAS etc.)
- 22:14, 18 October 2020 (diff | hist) How to check certification (e.g. ISO 9001, ISO 45001, UKAS etc.)
- 22:00, 18 October 2020 (diff | hist) N How to check certification (e.g. ISO 9001, ISO 45001, UKAS etc.) (Created page with "= Introduction = It is common for organisations to obtain certification which verifies compliance to particular standards. Dependent upon the certification, this can include: *...")
- 21:58, 18 October 2020 (diff | hist) N File:094 Fig 1 Certification Bodies Summary.png (top)
- 23:06, 5 October 2020 (diff | hist) Temporary Works Design - A Quality Management Perspective
- 22:15, 2 October 2020 (diff | hist) Temporary Works Design - A Quality Management Perspective
- 22:00, 2 October 2020 (diff | hist) User:ConSIG CWG
- 21:57, 2 October 2020 (diff | hist) Temporary Works Design - A Quality Management Perspective
- 21:55, 2 October 2020 (diff | hist) Temporary Works Design - A Quality Management Perspective
- 21:51, 2 October 2020 (diff | hist) Temporary Works Design - A Quality Management Perspective
- 21:48, 2 October 2020 (diff | hist) Temporary Works Design - A Quality Management Perspective
- 21:41, 2 October 2020 (diff | hist) User:ConSIG CWG
- 21:39, 2 October 2020 (diff | hist) User:ConSIG CWG
- 21:36, 2 October 2020 (diff | hist) Temporary Works Design - A Quality Management Perspective
- 21:26, 2 October 2020 (diff | hist) N Temporary Works Design - A Quality Management Perspective (Created page with "= Introduction = ‘Temporary works’ is a widely used expression in the construction industry. It may be useful to consider a respected definition to begin. BS 5975:2019 – C...")
- 21:02, 2 October 2020 (diff | hist) N File:086 Fig 1 Risk Management Process.png (top)
- 20:54, 2 October 2020 (diff | hist) N File:086 Fig 2 Temporary Works Process.png (top)
- 15:18, 17 August 2020 (diff | hist) N Checking and approval in design (Redirected page to Checking and approval in design - a quality management perspective) (top)
- 15:18, 17 August 2020 (diff | hist) N Checking design (Redirected page to Checking and approval in design - a quality management perspective) (top)
- 15:15, 17 August 2020 (diff | hist) User:ConSIG CWG
- 15:10, 17 August 2020 (diff | hist) Quality checklist
- 15:09, 17 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 15:06, 17 August 2020 (diff | hist) Quality checklist
- 15:03, 17 August 2020 (diff | hist) User:ConSIG CWG
- 21:05, 15 August 2020 (diff | hist) User:ConSIG CWG
- 21:01, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:58, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:52, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:48, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:41, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:30, 15 August 2020 (diff | hist) N Checking and approval in design - a quality management perspective (Created page with "= Introduction = Procedures for control of design and construction must have originated in early history. The Great Pyramid of Giza, Egypt is famous for the accuracy of the geom...")
- 17:49, 15 August 2020 (diff | hist) Quality checklist
- 17:48, 15 August 2020 (diff | hist) N Quality checklist (Created page with "= Background = The toolkit of Quality Management professional typically includes various tools and techniques to help in the process of quality planning (setting out requirement...")
- 17:37, 15 August 2020 (diff | hist) N File:003.4 Checklists Fig3.png (top)
- 17:35, 15 August 2020 (diff | hist) N File:003.4 Checklists Fig2.png (top)
- 17:33, 15 August 2020 (diff | hist) N File:003.4 Checklists Fig1.png (top)
- 15:01, 10 February 2020 (diff | hist) User:ConSIG CWG
- 07:47, 24 January 2020 (diff | hist) User:ConSIG CWG
- 13:01, 15 January 2020 (diff | hist) Cost of quality (COQ)
- 12:59, 15 January 2020 (diff | hist) Cost of quality (COQ)
- 12:56, 15 January 2020 (diff | hist) N Cost of quality (COQ) (Created page with "== What is cost of quality (COQ)? == More accurately the question should be `What is the cost of poor quality?` or even `What is the cost of not getting it right first time?`. T...")
- 12:35, 15 January 2020 (diff | hist) N File:Cost of quality Figure 2.png (top)
- 12:34, 15 January 2020 (diff | hist) N File:Cost of quality Figure 1.png (top)
- 12:52, 14 January 2020 (diff | hist) Quality management systems (QMS) - beyond the documentation
- 12:44, 14 January 2020 (diff | hist) Quality management systems (QMS) - beyond the documentation
- 12:28, 14 January 2020 (diff | hist) N Quality management systems (QMS) - beyond the documentation (Created page with "= Introduction = For many organisations, the quality management system (QMS) exists to save money. For others it provides assurance that its systems are robust and meet a set of...")
- 12:25, 14 January 2020 (diff | hist) N File:Cultural Web.gif (Diagram for ConSIG article: Quality management systems (QMS) - beyond the documentation) (top)
- 09:25, 19 September 2019 (diff | hist) User:ConSIG CWG
- 09:58, 9 September 2019 (diff | hist) Digital quality management in construction
- 09:50, 9 September 2019 (diff | hist) N File:Digital management in construction Figure 1.png (Digital quality management in construction Figure 1) (top)
- 09:41, 9 September 2019 (diff | hist) N Digital quality management in construction (Created page with "= Introduction = Managing the quality of design and construction has been a skill set for millennia, dating back to the earliest structures, when accepting and rejecting the qua...")
- 13:34, 3 July 2019 (diff | hist) User:ConSIG CWG
- 13:33, 3 July 2019 (diff | hist) User:ConSIG CWG
- 11:46, 18 June 2019 (diff | hist) N Auditing management systems (Created page with "= 1.Introduction = Auditing is a prime way of locating risk in management systems and acting to reduce that risk to as low as reasonably practicable. It is key to continuous imp...")
- 19:27, 26 May 2019 (diff | hist) Failure modes and effect analysis (FMEA)
- 19:17, 26 May 2019 (diff | hist) Failure modes and effect analysis (FMEA)
- 19:05, 26 May 2019 (diff | hist) N Failure modes and effect analysis (FMEA) (Created page with "== What is FMEA and when is it used? == FMEA is a step by step approach for collecting knowledge about possible points of failure in a design, manufacturing or construction proc...")
- 17:55, 26 May 2019 (diff | hist) File:Picture1.jpg (Replaced content with " ") (top)
- 17:53, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:52, 26 May 2019 (diff | hist) File:Picture1.jpg (uploaded a new version of "File:Picture1.jpg")
- 17:49, 26 May 2019 (diff | hist) N File:Picture1.jpg (Fishbone diagram)
- 17:46, 26 May 2019 (diff | hist) N File:Picture1.pdf (Fishbone diagram) (top)
- 17:43, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:35, 26 May 2019 (diff | hist) N File:Picture1.png (top)
- 17:30, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:24, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:15, 26 May 2019 (diff | hist) N Quality tools: fishbone diagram (Created page with "What is it? Created by Kaoru Ishikawa in the 1960s, the Fishbone diagram (cause and effect diagram) is a visual tool that shows the potential relationship between a topic (outpu...")
- 13:08, 27 March 2019 (diff | hist) N Quality culture and behaviours (Created page with "== Introduction == A quality culture is often described as a mind-set throughout the organisation with shared values and beliefs. Many construction companies have embraced beha...")
- 14:14, 28 February 2019 (diff | hist) Quality manuals and quality plans
- 13:32, 28 February 2019 (diff | hist) 5 Whys
- 13:31, 28 February 2019 (diff | hist) N 5 Whys (Created page with "= 5 Whys = Introduction The ‘root cause’ is the true or underlying reason why something has happened - usually something that has gone wrong. Finding the root cause enables...")
- 14:55, 1 February 2019 (diff | hist) The importance of welding assurance
- 14:07, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 14:01, 1 February 2019 (diff | hist) N File:CQI Stakeholder management diag 2.png (Stakeholder mapping) (top)
- 14:00, 1 February 2019 (diff | hist) N File:CQI Stakeholder management diag 1.png (ODA legacy diagram) (top)
- 13:53, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 13:52, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 13:39, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 13:17, 1 February 2019 (diff | hist) N Stakeholder management: a quality perspective (Created page with "= Introduction = The increased use of the term ‘stakeholder’ in business – used to describe any group or individual that has some, however small, vested interest or influe...")
- 07:27, 27 January 2019 (diff | hist) Quality manuals and quality plans
- 13:44, 7 January 2019 (diff | hist) Inspection & Test Plan
- 13:51, 6 January 2019 (diff | hist) Building completion
- 13:46, 6 January 2019 (diff | hist) N File:Building completion Fig5.png (top)
- 13:45, 6 January 2019 (diff | hist) N File:Building completion Fig4.png (top)
- 13:45, 6 January 2019 (diff | hist) N File:Building completion Fig3.png (top)
- 13:44, 6 January 2019 (diff | hist) N File:Building completion Fig2.png (top)
- 13:40, 6 January 2019 (diff | hist) Building completion
- 13:39, 6 January 2019 (diff | hist) N File:Building completion Fig1.png (Building completion Fig 1) (top)
- 12:24, 6 January 2019 (diff | hist) Building completion
- 12:13, 6 January 2019 (diff | hist) Building completion
- 11:59, 6 January 2019 (diff | hist) Building completion
- 11:39, 6 January 2019 (diff | hist) N Building completion (Created page with "= Executive summary = Building completion is the critical stage in which the activities that have been undertaken to fulfil the building contact requirements are brought togethe...")
- 15:48, 5 January 2019 (diff | hist) N Collaboration: a quality management perspective (Created page with "== Summary == This article discusses what collaborative working is intended to achieve, emphasising the basis upon which collaboration can be successfully put in place between p...")
- 14:58, 5 January 2019 (diff | hist) The importance of welding assurance
- 14:57, 5 January 2019 (diff | hist) Structural steelwork: a quality perspective
- 14:55, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:49, 5 January 2019 (diff | hist) Quality manuals and quality plans
- 13:44, 5 January 2019 (diff | hist) Design: a quality management perspective
- 13:42, 5 January 2019 (diff | hist) Assurance and self-certification
- 13:41, 5 January 2019 (diff | hist) Assurance and self-certification
- 13:40, 5 January 2019 (diff | hist) Annex SL
- 13:38, 5 January 2019 (diff | hist) CDM Regulations: a quality perspective
- 13:35, 5 January 2019 (diff | hist) Design freeze: a quality perspective
- 13:33, 5 January 2019 (diff | hist) Why should quality be important to the construction industry?
- 13:31, 5 January 2019 (diff | hist) Change control: a quality perspective
- 13:29, 5 January 2019 (diff | hist) Mobilisation to site: a quality perspective
- 13:27, 5 January 2019 (diff | hist) Structural steelwork: a quality perspective
- 13:24, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:23, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:21, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:18, 5 January 2019 (diff | hist) Inspection & Test Plan
- 13:17, 5 January 2019 (diff | hist) How to write an inspection and test plan
(Latest | Earliest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.