All public logs
- 17:28, 12 May 2025 Editor (Talk | contribs) marked revision 302189 of Resilient façade systems for smog reduction in Shanghai: a technical approach patrolled (automatic)
- 17:26, 12 May 2025 Editor (Talk | contribs) uploaded "File:Resilient smog facade systems ATJ 135 Ethan Liu MCIAT 3 1000.jpg" (((ATJ_13_Spring_25 Resilient façade systems for smog reduction in Shanghai: a technical approach by Ethan Liu MCIAT. Simulation of the external shading system (screens half closed and half open))))
- 17:25, 12 May 2025 Editor (Talk | contribs) uploaded "File:Resilient smog facade systems ATJ 135 Ethan Liu MCIAT 3 350.jpg" ((ATJ_13_Spring_25 Resilient façade systems for smog reduction in Shanghai: a technical approach by Ethan Liu MCIAT. Simulation of the external shading system (screens half closed and half open)))
- 17:24, 12 May 2025 Editor (Talk | contribs) uploaded "File:Resilient smog facade systems ATJ 135 Ethan Liu MCIAT 2 1000.jpg" ((ATJ_13_Spring_25 Resilient façade systems for smog reduction in Shanghai: a technical approach by Ethan Liu MCIAT. Analysis of wind testing in the on-summer period by Autodesk Flow Design and Detail of the wind simulation in the summer period by Autodes)
- 17:23, 12 May 2025 Editor (Talk | contribs) uploaded "File:Resilient smog facade systems ATJ 135 Ethan Liu MCIAT 1 1000.jpg" ((ATJ_13_Spring_25 Resilient façade systems for smog reduction in Shanghai: a technical approach by Ethan Liu MCIAT. The view of the Sky Tower in Pudong District, Shanghai by Rhino 3D and image of Ethan Liu MCIAT.))
- 17:22, 12 May 2025 Editor (Talk | contribs) uploaded "File:Resilient smog facade systems ATJ 135 Ethan Liu MCIAT 3a 1000.jpg" ((ATJ_13_Spring_25 Resilient façade systems for smog reduction in Shanghai: a technical approach by Ethan Liu MCIAT. The view of the Sky Tower in Pudong District, Shanghai by Rhino 3D and image of Ethan Liu MCIAT.))
- 17:19, 12 May 2025 Editor (Talk | contribs) marked revision 302183 of Resilient façade systems for smog reduction in Shanghai: a technical approach patrolled (automatic)
- 17:18, 12 May 2025 Editor (Talk | contribs) marked revision 302182 of Resilient façade systems for smog reduction in Shanghai: a technical approach patrolled (automatic)
- 17:17, 12 May 2025 Editor (Talk | contribs) uploaded "File:Resilient smog façade systems ATJ 135 Ethan Liu MCIAT 1 1000.jpg" (ATJ_13_Spring_25 Resilient façade systems for smog reduction in Shanghai: a technical approach by Ethan Liu MCIAT. The view of the Sky Tower in Pudong District, Shanghai by Rhino 3D and image of Ethan Liu MCIAT.)
- 17:16, 12 May 2025 Editor (Talk | contribs) uploaded "File:Resilient smog façade systems ATJ 135 Ethan Liu MCIAT 2 1000.jpg" (ATJ_13_Spring_25 Resilient façade systems for smog reduction in Shanghai: a technical approach by Ethan Liu MCIAT. Analysis of wind testing in the on-summer period by Autodesk Flow Design and Detail of the wind simulation in the summer period by Autodes)
- 17:14, 12 May 2025 Editor (Talk | contribs) uploaded "File:Resilient smog façade systems ATJ 135 Ethan Liu MCIAT 3 1000.jpg" (ATJ_13_Spring_25 Resilient façade systems for smog reduction in Shanghai: a technical approach by Ethan Liu MCIAT. Simulation of the external shading system (screens half closed and half open))
- 17:14, 12 May 2025 Editor (Talk | contribs) uploaded "File:Resilient smog façade systems ATJ 135 Ethan Liu MCIAT 3 350.jpg" (ATJ_13_Spring_25 Resilient façade systems for smog reduction in Shanghai: a technical approach by Ethan Liu MCIAT. Simulation of the external shading system (screens half closed and half open))
- 17:12, 12 May 2025 Editor (Talk | contribs) marked revision 302177 of Resilient façade systems for smog reduction in Shanghai: a technical approach patrolled (automatic)
- 16:46, 12 May 2025 Editor (Talk | contribs) marked revision 302176 of Resilient façade systems for smog reduction in Shanghai: a technical approach patrolled (automatic)
- 16:40, 12 May 2025 Editor (Talk | contribs) marked revision 302175 of Resilient façade systems for smog reduction in Shanghai: a technical approach patrolled (automatic)
- 16:39, 12 May 2025 Editor (Talk | contribs) marked revision 302174 of The benefits of precast, off-site foundation systems in modern construction patrolled (automatic)
- 16:36, 12 May 2025 Editor (Talk | contribs) uploaded "File:Foundation systems ATJ 13 Spring 25 Joe Bayley MCIAT, Roger Bullivant Ltd 1 1000.jpg" (ATJ_13_Spring_25__Joe_Bayley_MCIAT,_Roger_Bullivant_Ltd_2_1000.jpg The benefits of precast, off-site foundation systems in modern construction)
- 16:36, 12 May 2025 Editor (Talk | contribs) uploaded "File:Foundation systems ATJ 13 Spring 25 Joe Bayley MCIAT, Roger Bullivant Ltd 2 1000.jpg" (ATJ_13_Spring_25__Joe_Bayley_MCIAT,_Roger_Bullivant_Ltd_2_1000.jpg The benefits of precast, off-site foundation systems in modern construction)
- 16:21, 12 May 2025 Editor (Talk | contribs) marked revision 302171 of The benefits of precast, off-site foundation systems in modern construction patrolled (automatic)
- 16:16, 12 May 2025 Editor with an expiry time of 3 months (anonymous users only, account creation disabled)
- 15:24, 12 May 2025 Editor (Talk | contribs) marked revision 302169 of Featured articles and news patrolled (automatic)
- 15:24, 12 May 2025 Editor (Talk | contribs) marked revision 302168 of Digital technology, transformation and cybersecurity patrolled (automatic)
- 15:22, 12 May 2025 Editor (Talk | contribs) moved Supporting SMEs through Digitalisation in Construction to Digital technology, transformation and cybersecurity
- 15:19, 12 May 2025 Editor (Talk | contribs) marked revision 302165 of Supporting SMEs through Digitalisation in Construction patrolled (automatic)
- 15:16, 12 May 2025 Editor (Talk | contribs) uploaded "File:CIOB technical publications digi and cyber 350.jpg" (https://www.ciobacademy.org/product/impact-of-digital-technology-on-productivity-in-construction-for-companies-of-all-sizes/ https://www.designingbuildings.co.uk/wiki/Digital_Transformation_for_SMEs:_Unlocking_the_Benefits https://www.ncsc.gov.uk/guidanc)
- 14:51, 12 May 2025 Editor (Talk | contribs) marked revision 302163 of Supporting SMEs through Digitalisation in Construction patrolled (automatic)
- 14:49, 12 May 2025 Editor (Talk | contribs) marked revision 302162 of Supporting SMEs through Digitalisation in Construction patrolled (automatic)
- 14:47, 12 May 2025 Editor (Talk | contribs) marked revision 302161 of Cyber security for construction businesses patrolled (automatic)
- 14:43, 12 May 2025 Editor (Talk | contribs) marked revision 302160 of Supporting SMEs through Digitalisation in Construction patrolled (automatic)
- 14:42, 12 May 2025 Editor (Talk | contribs) marked revision 302159 of Cyber security for construction businesses patrolled (automatic)
- 14:42, 12 May 2025 Editor (Talk | contribs) marked revision 302158 of Cyber security for construction businesses patrolled (automatic)
- 14:41, 12 May 2025 Editor (Talk | contribs) uploaded "File:CIOB cyber security for construction forward 1000.jpg" (https://www.ncsc.gov.uk/guidance/cyber-security-for-construction-businesses)
- 14:35, 12 May 2025 Editor (Talk | contribs) uploaded "File:CIOB technical publications banner 1000.jpg" (https://www.ciobacademy.org/publications/)
- 14:18, 12 May 2025 Editor (Talk | contribs) uploaded "File:CIOB cyber security for construction spread 1000.jpg" (https://www.ncsc.gov.uk/files/Construction_Guidance_English_Printer_Version.pdf)
- 14:11, 12 May 2025 Editor (Talk | contribs) marked revision 302153 of Supporting SMEs through Digitalisation in Construction patrolled (automatic)
- 13:56, 12 May 2025 Institute of Historic Building Conservation (Talk | contribs) uploaded a new version of "File:2018 Terrace adj Evesham Railway Station.png"
- 13:56, 12 May 2025 Institute of Historic Building Conservation (Talk | contribs) uploaded "File:2018 Terrace adj Evesham Railway Station.png"
- 13:31, 12 May 2025 Editor (Talk | contribs) blocked Dataintelo (Talk | contribs) with an expiry time of 1 month (account creation disabled)
- 11:55, 12 May 2025 Editor with an expiry time of 3 months (anonymous users only, account creation disabled)
- 11:02, 12 May 2025 Editor (Talk | contribs) marked revision 302145 of Supporting SMEs through Digitalisation in Construction patrolled (automatic)
- 10:49, 12 May 2025 Editor (Talk | contribs) marked revision 302144 of Design and construction material libraries patrolled (automatic)
- 10:49, 12 May 2025 Editor (Talk | contribs) uploaded "File:Product libraries 350.jpg" (https://www.bing.com/images/create/make-me-an-image-of-a-samples-library-in-a-small-c/1-6821cf21146843dfab620ae16f66b8ed?id=EG8%2fl89zg5FqYbCd0NSXow%3d%3d&view=detailv2&idpp=genimg&thId=OIG4.Kv8tgl1NnfHw9mGx3Qyy&skey=FJ--AWQWZ53xG-W1-LnDZVPdDQHDj_rXm1xM5N)
- 10:49, 12 May 2025 Editor (Talk | contribs) uploaded "File:Product libraries 1000.jpg" (https://www.bing.com/images/create/make-me-an-image-of-a-samples-library-in-a-small-c/1-6821cf21146843dfab620ae16f66b8ed?id=EG8%2fl89zg5FqYbCd0NSXow%3d%3d&view=detailv2&idpp=genimg&thId=OIG4.Kv8tgl1NnfHw9mGx3Qyy&skey=FJ--AWQWZ53xG-W1-LnDZVPdDQHDj_rXm1xM5N)
- 10:43, 12 May 2025 Designing Buildings (Talk | contribs) protected "CPIc archive quick links" [edit=sysop] (indefinite) [move=sysop] (indefinite) (hist)
- 10:43, 12 May 2025 Designing Buildings (Talk | contribs) protected "About CPIc archive" [edit=sysop] (indefinite) [move=sysop] (indefinite) (hist)
- 10:43, 12 May 2025 Designing Buildings (Talk | contribs) marked revision 302139 of About CPIc archive patrolled (automatic)
- 10:43, 12 May 2025 Designing Buildings (Talk | contribs) marked revision 302138 of CPIc archive quick links patrolled (automatic)
- 10:43, 12 May 2025 Editor with an expiry time of 3 months (anonymous users only, account creation disabled)
- 10:42, 12 May 2025 Designing Buildings (Talk | contribs) marked revision 302137 of CPIc archive quick links patrolled (automatic)
- 10:33, 12 May 2025 Designing Buildings (Talk | contribs) protected "The Construction Research Programme – Project Showcase" [edit=sysop] (indefinite) [move=sysop] (indefinite) (hist)
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
New UK National Buildings Database.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief explanation from a building compliance expert, with further links.
















