File list
This special page shows all uploaded files. When filtered by user, only files where that user uploaded the most recent version of the file are shown.
| Thumbnail | Date |
Name | User | Size | Description | Versions |
|---|---|---|---|---|---|---|
| 09:56, 6 September 2024 | BCA logo 1000.jpg (file) | Editor | 73 KB | (website closed ) | 1 | |
| 09:55, 6 September 2024 | BCA logo 350.jpg (file) | Editor | 60 KB | (website closed ) | 1 | |
| 08:49, 6 September 2024 | A Comprehensive Construction Risk Management Toolkit-01.png (file) | Milestone PLM Solutions | 1.5 MB | 1 | ||
| 06:52, 6 September 2024 | Structural BIM Services into Traditional Engineering Workflow.jpg (file) | Uniquescadd | 584 KB | 1 | ||
| 06:21, 6 September 2024 | Designing Buildings Newsletter 6 9 2024.pdf (file) | Designing Buildings | 910 KB | (Designing Buildings Newsletter 6 9 2024) | 1 | |
| 14:00, 5 September 2024 | International retrofit conference 24 350.jpg (file) | Editor | 98 KB | (https://be-stevents.squarespace.com/events/p/international-retrofit-conference) | 1 | |
| 13:06, 5 September 2024 | Vertical Horizons Exploring the Future of Urban Development 2-01.png (file) | Milestone PLM Solutions | 1.38 MB | 1 | ||
| 13:00, 5 September 2024 | PH TRUST conf 24 350.jpg (file) | Editor | 78 KB | (https://passivhaustrust.org.uk/event_detail.php?eId=1277) | 1 | |
| 12:00, 5 September 2024 | Retrofit revisited film 350.jpg (file) | Editor | 60 KB | (Retrofit Reimagined: The Future Is Already Here https://www.youtube.com/watch?v=8m2hSkCZ_zE) | 1 | |
| 11:32, 5 September 2024 | Bruce Sounes Grenfell inquiry 350 .jpg (file) | Editor | 70 KB | (https://www.grenfelltowerinquiry.org.uk/hearings/studio-e-evidence-2-march-2020) | 1 | |
| 08:54, 5 September 2024 | IHBC HSE figures edited align 350.jpg (file) | Editor | 52 KB | (((https://press.hse.gov.uk/2024/08/07/registration-data-reflects-building-control-professions-commitment-to-high-standards/ https://newsblogs.ihbc.org.uk/?p=40854))) | 1 | |
| 08:53, 5 September 2024 | IHBC HSE figures edited 350.jpg (file) | Editor | 52 KB | ((https://press.hse.gov.uk/2024/08/07/registration-data-reflects-building-control-professions-commitment-to-high-standards/ https://newsblogs.ihbc.org.uk/?p=40854)) | 1 | |
| 08:41, 5 September 2024 | BSRIA actuate we establish 350.jpg (file) | Editor | 79 KB | (https://www.linkedin.com/posts/actuate-uk_actuate-engineeringservicesalliance-engineeringservices-activity-7228325570500067328-AEv5?utm_source=share&utm_medium=member_desktop https://www.actuateuk.org.uk/policy-areas/) | 1 | |
| 08:35, 5 September 2024 | IHBC HSE figure 350.jpg (file) | Editor | 46 KB | (https://press.hse.gov.uk/2024/08/07/registration-data-reflects-building-control-professions-commitment-to-high-standards/ https://newsblogs.ihbc.org.uk/?p=40854) | 1 | |
| 21:30, 4 September 2024 | P. Hansford P Morrell 350.jpg (file) | Editor | 27 KB | 1 | ||
| 21:16, 4 September 2024 | Peter Hansford .jpg (file) | Editor | 133 KB | (previous) | 1 | |
| 21:02, 4 September 2024 | Uni Queensland cladding library 350.jpg (file) | Editor | 81 KB | (https://claddingmaterialslibrary.com) | 1 | |
| 19:58, 4 September 2024 | Grenfell phase 2 report 7 at a glance 350.jpg (file) | Editor | 92 KB | ((https://assets.publishing.service.gov.uk/media/66d818059084b18b95709f86/CCS0923434692-004_GTI_Phase_2_Volume_7_BOOKMARKED.pdf)) | 1 | |
| 19:49, 4 September 2024 | Grenfell phase 2 report 7 a brief look 1000.jpg (file) | Editor | 183 KB | (https://assets.publishing.service.gov.uk/media/66d818059084b18b95709f86/CCS0923434692-004_GTI_Phase_2_Volume_7_BOOKMARKED.pdf) | 1 | |
| 15:33, 4 September 2024 | Grenfell phase 2 report 7 highlight ecomendations 1000.jpg (file) | Editor | 140 KB | (https://assets.publishing.service.gov.uk/media/66d818059084b18b95709f86/CCS0923434692-004_GTI_Phase_2_Volume_7_BOOKMARKED.pdf) | 1 | |
| 14:51, 4 September 2024 | CIOB grenfell image 350.jpg (file) | Editor | 150 KB | (https://www.ciob.org/news/ciob-reacts-to-grenfell-tower-inquiry-report) | 1 | |
| 14:49, 4 September 2024 | Grenfell phase 2 report 7 recomendations 350.jpg (file) | Editor | 69 KB | (https://www.gov.uk/government/publications/publication-of-the-grenfell-tower-inquiry-phase-2-report) | 1 | |
| 11:28, 4 September 2024 | Scan to BIM for Historic Buildings.jpg (file) | Snehal Dodha | 1.25 MB | 1 | ||
| 11:21, 4 September 2024 | Grenfell phase 2 report 7 recomendations 1000.jpg (file) | Editor | 160 KB | (((https://www.gov.uk/government/publications/publication-of-the-grenfell-tower-inquiry-phase-2-report))) | 1 | |
| 11:05, 4 September 2024 | Item 25460.png (file) | Archiblog | 5.86 MB | 1 | ||
| 11:02, 4 September 2024 | Item 25459.jpg (file) | Archiblog | 728 KB | 1 | ||
| 10:59, 4 September 2024 | Item 25459 REV - Fenton-Longton Faculty Area QGIS.png (file) | Archiblog | 4.74 MB | 1 | ||
| 10:54, 4 September 2024 | Item 25459 - Fenton-Longton Faculty Area QGIS.png (file) | Archiblog | 4.74 MB | 1 | ||
| 10:51, 4 September 2024 | Item 25458 - Tunstall-Pitts Hill Faculty Area QGIS.png (file) | Archiblog | 4.75 MB | 1 | ||
| 10:50, 4 September 2024 | Item 25457 - Silverdale Faculty Area QGIS.png (file) | Archiblog | 4.44 MB | 1 | ||
| 10:49, 4 September 2024 | Why Sheet Metal Fabricators Are Transitioning from 2D CAD to 3D CAD 2-01.png (file) | Milestone PLM Solutions | 1.21 MB | 1 | ||
| 10:42, 4 September 2024 | Item 25456 - Pitts Hill Transfer Area sat.png (file) | Archiblog | 4.88 MB | 1 | ||
| 10:38, 4 September 2024 | Grenfell phase 2 report 7 volumes 350.jpg (file) | Editor | 60 KB | ((https://www.gov.uk/government/publications/publication-of-the-grenfell-tower-inquiry-phase-2-report)) | 1 | |
| 10:35, 4 September 2024 | Grenfell phase 2 report 7 volumes 1000.jpg (file) | Editor | 137 KB | (https://www.gov.uk/government/publications/publication-of-the-grenfell-tower-inquiry-phase-2-report) | 1 | |
| 10:29, 4 September 2024 | Item 25455 - Meir Transfer Area sat.png (file) | Archiblog | 4.98 MB | 1 | ||
| 10:28, 4 September 2024 | Item 25454 - Madeley Transfer Area sat.png (file) | Archiblog | 4 MB | 1 | ||
| 10:27, 4 September 2024 | Item 25453 - Pitts Hill Transfer Area sat.png (file) | Archiblog | 5.08 MB | 1 | ||
| 10:25, 4 September 2024 | Item 25452 - Meir Transfer Area map.png (file) | Archiblog | 4.87 MB | 1 | ||
| 10:01, 4 September 2024 | Item 25451 - Fenton-Longton Faculty Area sat.png (file) | Archiblog | 5.02 MB | 1 | ||
| 10:00, 4 September 2024 | Item 25450 - Tunstall-Pitts Hill Faculty Area sat.png (file) | Archiblog | 5.08 MB | 1 | ||
| 09:59, 4 September 2024 | Item 25449 - Silverdale Faculty Area sat.png (file) | Archiblog | 4.66 MB | 1 | ||
| 09:51, 4 September 2024 | Item 25448 - Fenton-Longton Faculty Area map.png (file) | Archiblog | 5.01 MB | 1 | ||
| 09:43, 4 September 2024 | Item 25447 REV - Tunstall-Pitts Hill Faculty Area map.png (file) | Archiblog | 7.35 MB | 1 | ||
| 09:41, 4 September 2024 | Item 25447 - Tunstall-Pitts Hill Faculty Area map.png (file) | Archiblog | 7.35 MB | 1 | ||
| 09:40, 4 September 2024 | Item 25446 REV - Silverdale Faculty Area map.png (file) | Archiblog | 6.66 MB | 1 | ||
| 09:36, 4 September 2024 | Item 25446 - Silverdale Faculty Area map.png (file) | Archiblog | 7.35 MB | 1 | ||
| 08:42, 4 September 2024 | Item 25445 - Meir Transfer Area map.png (file) | Archiblog | 8.57 MB | 1 | ||
| 08:42, 4 September 2024 | Item 25444 - Madeley Transfer Area map.png (file) | Archiblog | 8.02 MB | 1 | ||
| 08:41, 4 September 2024 | Item 25443 - Pitts Hill Transfer Area map.png (file) | Archiblog | 9.49 MB | 2 | ||
| 08:05, 4 September 2024 | Item 25442 - Meir Transfer Area.png (file) | Archiblog | 529 KB | 1 |
![]() First page |
![]() Previous page |
![]() Next page |
![]() Last page |
Featured articles and news
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.






Date


















