Deferred maintenance
To help develop this article, click 'Edit this article' above.
When budgets are under pressure, it can be tempting to put off planned and preventative maintenance programmes as a way of saving money. However, not only will it be necessary to face those costs at some point, they may in fact be higher than if they had been dealt with sooner, as straight-forward repairs become major replacements.
Job order contracting (JOC) is a procurement method (primarily used in the United States) for contracting construction services. JOC is often applied to deferred maintenance work that has accumulated over time.
[edit] Related articles on Designing Buildings
Featured articles and news
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
Comments