Unit pricing contract
In the United States, a unit price contract is a commonly-used type of construction contract.
It may be entered into based on a price per unit, such as an hourly rate, specific item, amount of work, volume, and so on. This can allow a contract to be agreed based on approximate quantities, and then the actual payment determined by the number of units actually required. For example, a price might be given per kilometre of highway to be laid, based on an approximate estimate of the distance required, and then the actual payment calculated based on measurement of the final length of the highway that has been constructed.
This type of contract is suitable for big public works such as infrastructure projects which involve repetitive tasks and resources that are easily quantifiable. However, if a project involves multiple complex trades and activities, it is not particularly suitable as it can be difficult to accurately predict the quantities needed for each unit.
Unit pricing can benefit the client because it is quite easy to compare and benchmark prices, and it can allow an early start to works before their exact extent has been determined. It can be beneficial for the contractor because it largely removes the risk of inaccurate estimation of uncertain quantities.
This is similar to a measurement contract in the UK.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.





















