Tender sum for construction contracts
The tender sum is the overall pricing figure proposed by a tendering contractor in accordance with the tender pricing document.
The objective of the tender pricing document is to:
- Enable like-for-like comparison between tenders and the cost plan (pre-tender estimate).
- Enable the cost consultant to assess where value lies within the different tenders (such as foundations or finishes) allowing assessment of value for money.
- Identify any significant differences in pricing between tenderers to ensure the design has been correctly interpreted.
- Identify areas of savings that might be negotiated with tenderers while still in competition.
- Form the financial basis of the tender report.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.