Risks in fees and appointments
Contents |
[edit] Introduction
Professional obligations and risks regarding appointment – Getting an appointment in place:
- To encourage efficiency by receiving complete information.
- To promote the start of a trustworthy business relationship.
[edit] Scenario: The brief
It is important to understand exactly what it is that the client requires. Any confusion in the briefing stage can lead to abortive work later on when a redesign is needed. Understanding the full scope of works is essential to charge the appropriate fee along with any premiums for additional services such as taking on the role of lead designer.
[edit] Invoice payments
Regular invoices, preferably on a monthly basis help to maintain a positive cash flow. RIBA Standard form of appointment contains fundamental terms of payment along with methods of dispute resolution in order to collet fees which are due.
[edit] Scenario: Procurement route
If the large scale nature of a project means it is likely to be procured using design and build in order to limit the overall project costs, then a contractor can be appointed early to help negotiate a fixed price to the construction costs.
[edit] Scenario: Specialists' input
If the practice feels the services required are beyond their expertise, they may choose to sub-let the work to specialist sub-consultants and this will need to be clearly stated within the contract documentation. The client’s permission should be requested before appointing the sub consultant. A collateral warrant should be considered between the specialist and the client in order to protect the clients investment. The sub consultant appointment should be back-to-back with the architect's appointment.
[edit] Professional indemnity insurance
The practice should ensure an adequate level of professional indemnity insurance cover is maintained. The RIBA standard form of appointment includes provisions for adequate PII cover. PII is likely to be invalid if no contract is in place.
This includes a minimum level of cover and run-off cover.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.