London Cycle Network
Green infrastructure and open environments: The all London green grid. Supplementary planning guidance, published by the Mayor of London in March 2012, suggests that the London Cycle Network (Cycle Super Highways): ‘…is intended to make London a city for cyclists. It is an established network of radial and orbital routes for cyclists covering the whole of London. It has been planned as a socially inclusive cycling environment where high quality standards are maintained providing routes that are continuous, fast, safe, comfortable and easy to use. The network includes clear guidance on surface treatment and road markings where there is potential conflict between cyclists and other road users.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Our next guest editor Christine Peever
Practising Architect and Director of Sheldon Peever Studio.
Biodiversity net gain, tips and tools for small sites
How to deal with BNG when options become limited.
Registered building inspectors
Building types and conflicts of interest updates explained.
A brief run-down reminder of key points to note.
New electrical apprentice rates
Fair pay for much needed pipeline of electrical apprentices.
BSRIA's commitment to sustainability and net zero
Key documents that represent an early shift in thinking.
A resource for Cleaner Air, Better Tomorrow.
Awe-inspiring medieval great barns.
A history of timber construction in the UK
From a timber Stonehenge to half timber houses.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.