Chainage
![]() |
The term 'chainage' is used in surveying to refer to a distance measured in metres along an imaginary line, such as the centre line of a road or railway.
The term originated in 1620, when 66 feet chains (Gunter’s chains, named after mathematician Edmund Gunter) were first used to for the measurement of linear features such as roads or railways. The chain typically included 100 links, and 10 square chains was 1 acre. Cricket pitches are also generally 1 chain long, and a mile is 80 chains.
Ramsden's chains were longer chains of 100 feet developed in the 18th century.
Whilst this technique is no longer used, the name has remained, in particular in relation to railways, where it may be used to define the location of bridges and stations. A datum will be set as 0 at one point along the railway, and cumulative longitudinal distances measured using a device such as an odometer and then quoted along the length of the railway from that datum. This is generally sufficient to uniquely identify features such as bridges and stations.
[edit] Related articles on Designing Buildings
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
Comments
Thank you for the article. I work in the water industry and chainage seems to always refer to the distance on plan, neglecting the vertical component. I'm curious, are there standard terms for change that includes the vertical component of the ground and out of the pipeline, tunnel etc that is being constructed? Given the history the original chainage measurements would have included the vertical component of the ground. Was there/is there a different term for the chainage measurement of the ground before work began, and the finished chainage with cuttings and embankments in place? Many thanks