Chainage
|
The term 'chainage' is used in surveying to refer to a distance measured in metres along an imaginary line, such as the centre line of a road or railway.
The term originated in 1620, when 66 feet chains (Gunter’s chains, named after mathematician Edmund Gunter) were first used to for the measurement of linear features such as roads or railways. The chain typically included 100 links, and 10 square chains was 1 acre. Cricket pitches are also generally 1 chain long, and a mile is 80 chains.
Ramsden's chains were longer chains of 100 feet developed in the 18th century.
Whilst this technique is no longer used, the name has remained, in particular in relation to railways, where it may be used to define the location of bridges and stations. A datum will be set as 0 at one point along the railway, and cumulative longitudinal distances measured using a device such as an odometer and then quoted along the length of the railway from that datum. This is generally sufficient to uniquely identify features such as bridges and stations.
[edit] Related articles on Designing Buildings
Featured articles and news
A UK training and membership provider for mould remediation professionals.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
Independent NSI and BAFE study exploring how organisations are changing the way they buy fire safety services.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.
Setting Expectations on Competence Management
Industry Competence Committee.
New Scottish and Welsh governments
CIOB stresses importance of construction after new parliament elections.
The sad story of Derby Hippodrome
An historic building left to decay.
ECA, JIB and JTL back Fabian Society call to invest in skills for a stronger built environment workforce.
Women's Contributions to the Built Environment.
Calls for the delayed Circular Economy Strategy
Over 50 leading businesses, trade associations and professional bodies, including CIAT, and UKGBC sign open letter.
The future workforce: culture change and skill
Under the spotlight at UK Construction Week London.
A landmark moment for postmodern heritage.
























Comments
Thank you for the article. I work in the water industry and chainage seems to always refer to the distance on plan, neglecting the vertical component. I'm curious, are there standard terms for change that includes the vertical component of the ground and out of the pipeline, tunnel etc that is being constructed? Given the history the original chainage measurements would have included the vertical component of the ground. Was there/is there a different term for the chainage measurement of the ground before work began, and the finished chainage with cuttings and embankments in place? Many thanks