Chainage
|
The term 'chainage' is used in surveying to refer to a distance measured in metres along an imaginary line, such as the centre line of a road or railway.
The term originated in 1620, when 66 feet chains (Gunter’s chains, named after mathematician Edmund Gunter) were first used to for the measurement of linear features such as roads or railways. The chain typically included 100 links, and 10 square chains was 1 acre. Cricket pitches are also generally 1 chain long, and a mile is 80 chains.
Ramsden's chains were longer chains of 100 feet developed in the 18th century.
Whilst this technique is no longer used, the name has remained, in particular in relation to railways, where it may be used to define the location of bridges and stations. A datum will be set as 0 at one point along the railway, and cumulative longitudinal distances measured using a device such as an odometer and then quoted along the length of the railway from that datum. This is generally sufficient to uniquely identify features such as bridges and stations.
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.


















Comments
Thank you for the article. I work in the water industry and chainage seems to always refer to the distance on plan, neglecting the vertical component. I'm curious, are there standard terms for change that includes the vertical component of the ground and out of the pipeline, tunnel etc that is being constructed? Given the history the original chainage measurements would have included the vertical component of the ground. Was there/is there a different term for the chainage measurement of the ground before work began, and the finished chainage with cuttings and embankments in place? Many thanks