Reservation agreement for property purchase
A reservation agreement can be used in the purchase of new homes when a buyer reserves the right to purchase a property for a period of time. During this time (known as the ‘reservation period’), the seller agrees not to sell to another party. As part of the agreement, the buyer pays a deposit (known as the ‘reservation fee’). The reservation period typically lasts for a period of 28 days.
On the exchange of contracts, the fee is deducted from the deposit that is then placed. However, at any time during the reservation period the buyer can decide not to proceed with the purchase and can cancel the agreement. The fee is then reimbursed minus expenses such as the legal and administrative costs incurred by the seller.
Introduced in 2010, the Consumer Code for Homebuilders (‘the Code’) stated that the reservation agreement should set out the costs likely to be incurred for which the buyer will be liable. The seller may only deduct an amount that has been genuinely incurred in processing and holding the reservation and it is unacceptable to deduct a fixed percentage or amount.
Reservation agreements differ from exclusivity agreements, which are used to provide the buyer with some security from being outbid by establishing a period of time during which the seller agrees not to enter into negotiations with another party. Under a reservation agreement, the seller cannot enter into another such agreement with a different party but can enter into negotiations.
Since reservation fees can be significant (up to £20,000 at the higher end of the market), the agreement should be reviewed for the buyer by a legal professional before signing. However, in practice, it is typical for buyers to sign reservation agreements before instructing their lawyer.
A reservation agreement usually includes:
- The fee amount.
- The property being offered.
- The purchase price of the property.
- How long the price will remain valid.
- The length of the reservation period after which the agreement will expire.
- The estimated deductible expenses if contracts are not exchanged.
Before signing a reservation agreement, sellers should check that the terms reflect the requirements of the Code and ensure they do not enter another agreement for the same property with another party.
The New Homes Quality Board Glossary of the terms used in the Code and Guidance, published by The New Homes Quality Board in 2021, defines a reservation agreement as: ‘an agreement when a Customer and a Developer jointly make a written statement of intent (subject to Contract of Sale and whether or not a fee is paid) giving the Customer an exclusive period of time to enter into a Contract of Sale to buy a New Home. Reservation, Reserved and Reserve carry the corresponding meanings.’
It defines a Reservation Fee as: ‘the fee payable by the Customer upon entering into a Reservation Agreement with a Developer.’
[edit] Related articles on Designing Buildings
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.





















