Plan, Do, Check, Act (PDCA)
Plan, Do, Check, Act (PDCA) is a model that is used to assist the control and continual improvement of processes and projects. It has been used in construction project management as a means of balancing the systems and behavioural aspects of management and health and safety. Its cyclic approach allows for the constant updating of health and safety measure ultimately leading to a safer working environment.
PDCA was popularised by W. Edwards Deming, a leading figure in modern quality control processes and procedures. Deming intended that PDCA should be used when developing a new or improved process, product or service; when implementing changes; when defining a repetitive work process, and so on.
It is made up of the following stages:
- Plan: Assess a current or new process and how improvements could be made.
- Do: Test small changes as part of a limited study to assess their effectiveness.
- Check: Gather and analyse the test results, compare them with the expected outcomes and identify what has been learnt.
- Act: Take action according to the lesson learned in the ‘Check’ step.
In some iterations of PDCA, the fourth step ‘Act’ is replaced with ‘Adjust’. This is often used when the PDCA process has been run several times and enough information has been accumulated for it to have been adopted as a new ‘standard’. ‘Adjust’ allows for continual monitoring of the process after changes have been made, with small improvements as and when appropriate, creating a cycle of continuous improvement.
[edit] Related articles on Designing Buildings
- Assurance and self-certification.
- CDM Regulations: a quality perspective.
- Contingency theory.
- Continuous improvement process.
- Design freeze: a quality perspective.
- Digital engineering.
- Game theory.
- Lean construction.
- Lean Six Sigma.
- Pareto analysis.
- Project execution plan.
- Project manager.
- Quality control.
- Quality Management System.
- Total quality management in construction.
- Transition time.
Featured articles and news
Sustainability or sentimentality in the refurbishment sector.
Has the pendulum now swung too far ?
Negative impacts of political instability on projects
Expected by 64% of the respondents in nationwide survey.
BSRIA Market Intelligence Reports
World Building Automation and Control Systems (BACS) 2022
Statement of health and early intervention.
The importance of regular check-ups
And related links on DB.
Sustainable urban drainage systems SUDS
Rooflights, skylights, roof windows and Part L
Shedding some light on the new Building Regulations.
Interview with historic built environment surveyor.
Upgraded membership category now requires assessment.
The average kinetic energy of molecules
Temperature in buildings, explained on DB
Women and unequal pay in project management
Main barrier to entering the profession, new study reveals.
IHBC’s response to Parliamentary Committee
On Levelling-Up and Regeneration Bill.
Finalists for 2022 CIOB Awards revealed
Over 70 managers and organisations shortlisted for the 14 awards.
Types of building sensors on BD
From biometric to electrical current, chemical and more.
Government mandates detectors in rented homes
Changes are due to come into force on 1st October 2022.
80% of major government projects are rated red or amber
Heed advice and insight of this report IPA tells the government.
The end of the games but continued calls for action
From the Commonwealth Association of Architects.
Sustainable urban drainage systems SUDS
Comments
This doesn't seem have been developed for practical application in a construction environment.