Passive resistance measures
Guidance on the code of practice for property flood resilience, published by CIRIA in 2021, defines passive resistance measures as: ‘…measures which are installed into the property and do not require further deployment or activation before a flood event (eg a full height flood door or automatic airbrick cover.)
See also: Active resistance measures.
[edit] Related articles on Designing Buildings Wiki
- BREEAM Flood risk management.
- Building flood resilience.
- Environment Agency.
- Flood risk.
- Flood.
- Groundwater.
- Property flood resilience.
- Pumps and dewatering equipment.
- River engineering.
- Sustainable urban drainage systems.
- Temporary flood defences.
- Types of flood.
- Water engineering.
- Water table.
- Workplace design – flood protection.
Featured articles and news
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Update on the future of Grenfell Tower
Deputy Prime Minister decides for it be carefully taken down to the ground.
Ending decades of frustration, misinformation and distrust.
Essential tools in managing historically significant landscapes.
Classroom electrician courses a 'waste of money'
Say experts from the Electrical Contractors’ Association.
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.