Integrated design
The BIM Overlay to the RIBA Outline Plan of Work, published by the RIBA in 2012 defines integrated design as:
‘… the completed set of design information on a project, including the work of all designing subcontractors (Performance Specified Work) that is substantially aligned. The design can be said to have been integrated when all of the subcontractor design is completed. Subcontractor design can be utilised on all forms of procurement and is typically referred to as CDP (Contractor Design Portion) or PSW (Performance Specified Work). Whilst the work of subcontractors is being integrated into the design, there are possibilities that the coordinated design may need to be amended. This needs to be carefully dealt with, particularly when several designing subcontractors are working concurrently’
The Loss Prevention Standard (LSP 2082 : Issue 1.0), published by BRE Global in 2017, defines integrated design as: "A holistic approach to the design of a facility that, through the collaboration of many disciplines, leads to better design outcomes."
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.





















