File:Project plan management contract.jpg
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 05:09, 27 June 2013 | 800 × 106 (41 KB) | Designing Buildings (Talk | contribs) |
- Edit this file using an external application (See the setup instructions for more information)
File usage
The following 16 pages link to this file:
- Management contract: appointing consultants
- Management contract: appointing the management contractor
- Management contract: business justification
- Management contract: concept design
- Management contract: construction
- Management contract: detailed design
- Management contract: feasibility studies
- Management contract: mobilisation
- Management contract: occupation and defects liability period
- Management contract: outline work plan
- Management contract: planning permission
- Management contract: post occupation evaluation
- Management contract: production information
- Management contract: project brief
- Management contract: tender works contracts
- Project plans for building design and construction
Featured articles and news
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach £7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.