File:BS 7913 small.jpg

BS_7913_small.jpg(280 × 166 pixels, file size: 34 KB, MIME type: image/jpeg)

The holistic retrofit process following BS 7913: 2013 up to the advice and design stage: Dealing with existing fabric first. Inage source Retrofitting traditional buildings, from IHBC's Context 149, published in May 2017, written by John Edwards. http://ihbconline.co.uk/context/149/#13

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:26, 24 September 2017Thumbnail for version as of 08:26, 24 September 2017280 × 166 (34 KB)Designing Buildings (Talk | contribs) (The holistic retrofit process following BS 7913: 2013 up to the advice and design stage: Dealing with existing fabric first. Inage source Retrofitting traditional buildings, from IHBC's Context 149, published in May 2017, written by John Edwards. http://i)

There are no pages that link to this file.