Annual exceedance probability
Culvert, screen and outfall manual, (CIRIA C786) published by CIRIA in 2019, defines the annual exceedance probability as the: ‘Probability of exceeding a specified flow or level in any year (inverse of the return period for an annual maximum series.)’
See also: Return period.
[edit] Related articles on Designing Buildings Wiki
- Bund.
- Catchment flood management plans.
- Culvert.
- Detention pond.
- Flood and water management act.
- Flood risk management plans
- Flood risk.
- Median annual flood.
- Pitt Review Lessons learned from the 2007 floods.
- Return period.
- River engineering.
- SUDS Manual.
- Sustainable Urban Drainage Systems.
- Swales.
- Water engineering.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
ECA welcomes plans to strengthen subcontractor quality control.
Combining mid-career qualifications with experience broadens career opportunities.
Why being a mentor can help your career.
Channel 4 broadcaster to host 125th anniversary ceremony.
Listed structures on the rail network
Heritage interests and operational requirements must be balanced.
Historic England publishes research into embodied carbon when retrofitting traditional buildings.
New Prime Minister delivers on ECA call for cut in electricity costs.
CIOB reacts to the announcement of Andy Burnham as Prime Minister.
Heritage and conservation science workforce survey - Have your say.
England's Suburbs 1820-2020. Book review.
New, more proportionate and targeted approach for higher-risk building assessments.
Government brings British Steel into public ownership.

















