Construction management: outline work plan
This is an outline plan for a project following a construction management procurement route. Project plans for other procurement routes are available by clicking here.
Clicking on any of the stages will take you to the detailed tasks necessary to complete that stage. Together the tasks represent a single, consolidated project plan from the first moment it becomes apparent a project might be required right through to final evaluation of the completed project.
Construction management
Stage 1: Business justification.
Stage 2: Feasibility studies.
Stage 3: Project brief.
Stage 4: Concept design.
Stage 5: Appointing the construction manager.
Stage 6: Detailed design.
Stage 7: Production information.
Stage 8: Tender trade contracts.
Stage 9: Mobilisation.
Stage 10: Construction.
Stage 11: Occupation and defects liability period.
Stage 12: Post occupation evaluation.
Moveable stages:
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.























Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
Creating an outline work plan for construction management involves breaking down the project into manageable tasks and organizing them in a logical sequence. Here is a general outline of a work plan for construction management:
1. Project Initiation:
- Define project objectives, scope, and deliverables.
- Identify project stakeholders and establish communication channels.
- Conduct initial site assessment and feasibility studies.
- Develop project budget and timeline.
2. Pre-Construction Phase:
- Obtain necessary permits and approvals.
- Select and contract with architects, engineers, and consultants.
- Develop detailed project plans, including architectural and engineering drawings.
- Procure necessary materials, equipment, and subcontractors.
- Set up project site, including temporary facilities, safety measures, and logistics planning.
3. Construction Phase:
- Mobilize construction team and assign responsibilities.
- Coordinate with subcontractors, suppliers, and vendors.
- Monitor construction progress and ensure adherence to quality standards.
- Conduct regular site inspections and address any issues or delays.
- Manage project schedule, including tracking milestones and critical path activities.
- Implement safety protocols and monitor compliance.
- Manage project budget, including tracking expenses and cost control.
- Communicate progress to stakeholders through regular updates and meetings.
- Address any changes, variations, or unforeseen circumstances through proper change management procedures.
- Maintain documentation, including daily reports, progress photos, and records of work performed.
4. Project Completion and Closeout:
- Conduct final inspections and ensure compliance with building codes and regulations.
- Complete any necessary testing, commissioning, and certifications.
- Obtain final approvals and sign-offs from relevant authorities.
- Prepare operation and maintenance manuals, as-built drawings, and warranties.
- Coordinate project handover to the client, including training and support.
- Conduct project review and capture lessons learned.
- Finalize project accounts, including financial closeout.
- Celebrate project completion and recognize team accomplishments.
It is important to note that the specific tasks and sequence may vary depending on the size, complexity, and nature of the construction project. The work plan should be customized to align with the unique requirements of the project and the organization's standard project management processes. Regular monitoring, communication, and adjustment of the work plan are necessary throughout the construction project to ensure successful execution and delivery.