Difference between cost plan and budget
It is important not to confuse cost plans and budgets.
A budget is a statement of the amount of money available to spend over a period of time, or on a specific thing, such as a building. The budget is set by the client (although they make seek help to do this). It may include an outline plan for how that money will be spent, and a breakdown of the items it will be spent on. Budgets set a limit for expenditure and this can help determine what is affordable. They should be set as early as possible so that expectations can be managed. It is important that they are based on evidence and that they are realistic, rather than simply stating the amount of money available, or being a wild guess, because, once the budget is set in people's minds, it can be very difficult to change.
For more information see: Budget.
Cost plans are typically prepared by a cost consultant and provide an estimate of what the actual costs are likely to be. Cost plans evolve through the life of the project, developing in detail and accuracy as more information becomes available about the nature of the project. They can range from very early initial cost appraisals through to tender pricing documents and the final account. If the cost plan exceeds the budget, it may be necessary to reduce the cost or scope of the project.
For more information see: Cost plan.
[edit] Related articles on Designing Buildings
- Budget.
- Capital costs for construction projects.
- Construction costs.
- Cost control.
- Cost plans for construction projects.
- Cost management techniques used to monitor the cost of construction projects.
- Difference between collateral warranties and third party rights.
- Difference between preliminaries and preambles
- Elemental cost plan for design and construction.
- Final account.
- Outturn cost.
- Quantity surveyor.
- Tender pricing document.
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.