CDM principles of prevention
The Construction (Design and Management) Regulations (CDM Regulations) are intended to ensure that health and safety issues are properly considered during a project’s development so that the risk of harm to those who build, use and maintain structures is reduced.
They require that designers, principal designers, principal contractors and contractors to take account of the 'principles of prevention' in carrying out their duties. The principles of prevention are specified in Schedule 1 of the Management of Health and Safety at Work Regulations 1999 which apply to all industries, including construction. They provide a framework to identify and implement measures to control risks and in general terms are:
- (a) Avoid risks where possible.
- (b) Evaluate those risks that cannot be avoided.
- (c) Put in place measures that control them at source.
- (d) Adapt the work to the individual, especially regarding the design of workplaces, the choice of work equipment and the choice of working and production methods, with a view, in particular, to alleviating monotonous work, work at a predetermined work rate and to reducing their effect on health.
- (e) Adapt to technical progress.
- (f) Replace the dangerous by the non-dangerous or the less dangerous.
- (g) Develop a coherent overall prevention policy which covers technology, organisation of work, working conditions, social relationships and the influence of factors relating to the working environment.
- (h) Give collective protective measures priority over individual protective measures.
- (i) Give appropriate instructions to employees.
NB see also Fire principles of prevention.
[edit] Related articles on Designing Buildings Wiki
- CDM workers.
- Construction phase plan.
- Design risk management.
- Dutyholder.
- Fire principles of prevention.
- Health and safety.
- Health and safety file.
- Method statement.
- Notify HSE.
- Pre-construction information.
- Principal contractor.
- Principal designer.
- Reporting accidents and injuries on construction sites.
- Risk assessment.
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.