Plan, Do, Check, Act (PDCA)
Plan, Do, Check, Act (PDCA) is a model that is used to assist the control and continual improvement of processes and projects. It has been used in construction project management as a means of balancing the systems and behavioural aspects of management and health and safety. Its cyclic approach allows for the constant updating of health and safety measure ultimately leading to a safer working environment.
PDCA was popularised by W. Edwards Deming, a leading figure in modern quality control processes and procedures. Deming intended that PDCA should be used when developing a new or improved process, product or service; when implementing changes; when defining a repetitive work process, and so on.
It is made up of the following stages:
- Plan: Assess a current or new process and how improvements could be made.
- Do: Test small changes as part of a limited study to assess their effectiveness.
- Check: Gather and analyse the test results, compare them with the expected outcomes and identify what has been learnt.
- Act: Take action according to the lesson learned in the ‘Check’ step.
In some iterations of PDCA, the fourth step ‘Act’ is replaced with ‘Adjust’. This is often used when the PDCA process has been run several times and enough information has been accumulated for it to have been adopted as a new ‘standard’. ‘Adjust’ allows for continual monitoring of the process after changes have been made, with small improvements as and when appropriate, creating a cycle of continuous improvement.
[edit] Related articles on Designing Buildings
- Assurance and self-certification.
- CDM Regulations: a quality perspective.
- Contingency theory.
- Continuous improvement process.
- Design freeze: a quality perspective.
- Digital engineering.
- Game theory.
- Lean construction.
- Lean Six Sigma.
- Pareto analysis.
- Project execution plan.
- Project manager.
- Quality control.
- Quality Management System.
- Total quality management in construction.
- Transition time.
Featured articles and news
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.






















Comments
This doesn't seem have been developed for practical application in a construction environment.