Overall equipment effectiveness
QCD: measuring manufacturing performance, Published by the Department of Trade and Industry in 2004 suggested that Overall Equipment Effectiveness (OEE) measures: ‘…the availability, performance and quality of a process.’
It shows how well the business is utilising its resources, including equipment and labour, and is calculated by combining three elements:
- Availability – expressed as a percentage, compares the planned and actual time of the process run.
- Performance – expressed as a percentage, compares the actual and ideal output achieved during the running of the process.
- Quality – expressed as a percentage, compares the number of good parts made against the total parts made.
Overall Equipment Effectiveness (%) = Availability X Performance X Quality.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.