Financial year
A financial year – sometimes called the tax period, accounting period, fiscal year or budget year – is the period of time, usually 12 months, that is used for accounting purposes and for the submission of taxes to the Inland Revenue.
Organisations use the financial year to report on their progress and measure whether they have met their operational goals for that year. This helps them to plan for the following year.
For some businesses, it is preferable for their financial year to run from April 1 to March 31 the following year – a full 365 (or 366 days if a leap year). This aligns with the government’s fiscal year. However, for personal tax purposes, the year runs from April 6 to April 5 – a period which reflects the old ecclesiastical calendar.
Firms and individuals are free to choose an accounting period that is convenient to them, as long as they have informed the Inland Revenue. Operating a financial year that accords with the calendar year – January 1 to Dec 31 is preferable for some. Many large organisations in the UK use the calendar year as their accounting period, whereas for universities it typically ends during the summer to align with the close of the academic year.
[edit] Related articles on Designing Buildings Wiki
- Budget
- Business case.
- Business plan
- Capital allowances.
- Cash flow forecast.
- Cashflow.
- Financial hedging.
- Financial management tools.
- Remedies for late payment.
- VAT
- VAT - Option to tax (or to elect to waive exemption from VAT).
- VAT - Protected Buildings.
Featured articles and news
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.