User contributions
(Latest | Earliest) View (newer 100 | older 100) (20 | 50 | 100 | 250 | 500)
- 21:39, 2 October 2020 (diff | hist) User:ConSIG CWG
- 21:36, 2 October 2020 (diff | hist) Temporary Works Design - A Quality Management Perspective
- 21:26, 2 October 2020 (diff | hist) N Temporary Works Design - A Quality Management Perspective (Created page with "= Introduction = ‘Temporary works’ is a widely used expression in the construction industry. It may be useful to consider a respected definition to begin. BS 5975:2019 – C...")
- 21:02, 2 October 2020 (diff | hist) N File:086 Fig 1 Risk Management Process.png (top)
- 20:54, 2 October 2020 (diff | hist) N File:086 Fig 2 Temporary Works Process.png (top)
- 15:18, 17 August 2020 (diff | hist) N Checking and approval in design (Redirected page to Checking and approval in design - a quality management perspective) (top)
- 15:18, 17 August 2020 (diff | hist) N Checking design (Redirected page to Checking and approval in design - a quality management perspective) (top)
- 15:15, 17 August 2020 (diff | hist) User:ConSIG CWG
- 15:10, 17 August 2020 (diff | hist) Quality checklist
- 15:09, 17 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 15:06, 17 August 2020 (diff | hist) Quality checklist
- 15:03, 17 August 2020 (diff | hist) User:ConSIG CWG
- 21:05, 15 August 2020 (diff | hist) User:ConSIG CWG
- 21:01, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:58, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:52, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:48, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:41, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:30, 15 August 2020 (diff | hist) N Checking and approval in design - a quality management perspective (Created page with "= Introduction = Procedures for control of design and construction must have originated in early history. The Great Pyramid of Giza, Egypt is famous for the accuracy of the geom...")
- 17:49, 15 August 2020 (diff | hist) Quality checklist
- 17:48, 15 August 2020 (diff | hist) N Quality checklist (Created page with "= Background = The toolkit of Quality Management professional typically includes various tools and techniques to help in the process of quality planning (setting out requirement...")
- 17:37, 15 August 2020 (diff | hist) N File:003.4 Checklists Fig3.png (top)
- 17:35, 15 August 2020 (diff | hist) N File:003.4 Checklists Fig2.png (top)
- 17:33, 15 August 2020 (diff | hist) N File:003.4 Checklists Fig1.png (top)
- 15:01, 10 February 2020 (diff | hist) User:ConSIG CWG
- 07:47, 24 January 2020 (diff | hist) User:ConSIG CWG
- 13:01, 15 January 2020 (diff | hist) Cost of quality (COQ)
- 12:59, 15 January 2020 (diff | hist) Cost of quality (COQ)
- 12:56, 15 January 2020 (diff | hist) N Cost of quality (COQ) (Created page with "== What is cost of quality (COQ)? == More accurately the question should be `What is the cost of poor quality?` or even `What is the cost of not getting it right first time?`. T...")
- 12:35, 15 January 2020 (diff | hist) N File:Cost of quality Figure 2.png (top)
- 12:34, 15 January 2020 (diff | hist) N File:Cost of quality Figure 1.png (top)
- 12:52, 14 January 2020 (diff | hist) Quality management systems (QMS) - beyond the documentation
- 12:44, 14 January 2020 (diff | hist) Quality management systems (QMS) - beyond the documentation
- 12:28, 14 January 2020 (diff | hist) N Quality management systems (QMS) - beyond the documentation (Created page with "= Introduction = For many organisations, the quality management system (QMS) exists to save money. For others it provides assurance that its systems are robust and meet a set of...")
- 12:25, 14 January 2020 (diff | hist) N File:Cultural Web.gif (Diagram for ConSIG article: Quality management systems (QMS) - beyond the documentation) (top)
- 09:25, 19 September 2019 (diff | hist) User:ConSIG CWG
- 09:58, 9 September 2019 (diff | hist) Digital quality management in construction
- 09:50, 9 September 2019 (diff | hist) N File:Digital management in construction Figure 1.png (Digital quality management in construction Figure 1) (top)
- 09:41, 9 September 2019 (diff | hist) N Digital quality management in construction (Created page with "= Introduction = Managing the quality of design and construction has been a skill set for millennia, dating back to the earliest structures, when accepting and rejecting the qua...")
- 13:34, 3 July 2019 (diff | hist) User:ConSIG CWG
- 13:33, 3 July 2019 (diff | hist) User:ConSIG CWG
- 11:46, 18 June 2019 (diff | hist) N Auditing management systems (Created page with "= 1.Introduction = Auditing is a prime way of locating risk in management systems and acting to reduce that risk to as low as reasonably practicable. It is key to continuous imp...")
- 19:27, 26 May 2019 (diff | hist) Failure modes and effect analysis (FMEA)
- 19:17, 26 May 2019 (diff | hist) Failure modes and effect analysis (FMEA)
- 19:05, 26 May 2019 (diff | hist) N Failure modes and effect analysis (FMEA) (Created page with "== What is FMEA and when is it used? == FMEA is a step by step approach for collecting knowledge about possible points of failure in a design, manufacturing or construction proc...")
- 17:55, 26 May 2019 (diff | hist) File:Picture1.jpg (Replaced content with " ") (top)
- 17:53, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:52, 26 May 2019 (diff | hist) File:Picture1.jpg (uploaded a new version of "File:Picture1.jpg")
- 17:49, 26 May 2019 (diff | hist) N File:Picture1.jpg (Fishbone diagram)
- 17:46, 26 May 2019 (diff | hist) N File:Picture1.pdf (Fishbone diagram) (top)
- 17:43, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:35, 26 May 2019 (diff | hist) N File:Picture1.png (top)
- 17:30, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:24, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:15, 26 May 2019 (diff | hist) N Quality tools: fishbone diagram (Created page with "What is it? Created by Kaoru Ishikawa in the 1960s, the Fishbone diagram (cause and effect diagram) is a visual tool that shows the potential relationship between a topic (outpu...")
- 13:08, 27 March 2019 (diff | hist) N Quality culture and behaviours (Created page with "== Introduction == A quality culture is often described as a mind-set throughout the organisation with shared values and beliefs. Many construction companies have embraced beha...")
- 14:14, 28 February 2019 (diff | hist) Quality manuals and quality plans
- 13:32, 28 February 2019 (diff | hist) 5 Whys
- 13:31, 28 February 2019 (diff | hist) N 5 Whys (Created page with "= 5 Whys = Introduction The ‘root cause’ is the true or underlying reason why something has happened - usually something that has gone wrong. Finding the root cause enables...")
- 14:55, 1 February 2019 (diff | hist) The importance of welding assurance
- 14:07, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 14:01, 1 February 2019 (diff | hist) N File:CQI Stakeholder management diag 2.png (Stakeholder mapping) (top)
- 14:00, 1 February 2019 (diff | hist) N File:CQI Stakeholder management diag 1.png (ODA legacy diagram) (top)
- 13:53, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 13:52, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 13:39, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 13:17, 1 February 2019 (diff | hist) N Stakeholder management: a quality perspective (Created page with "= Introduction = The increased use of the term ‘stakeholder’ in business – used to describe any group or individual that has some, however small, vested interest or influe...")
- 07:27, 27 January 2019 (diff | hist) Quality manuals and quality plans
- 13:44, 7 January 2019 (diff | hist) Inspection & Test Plan
- 13:51, 6 January 2019 (diff | hist) Building completion
- 13:46, 6 January 2019 (diff | hist) N File:Building completion Fig5.png (top)
- 13:45, 6 January 2019 (diff | hist) N File:Building completion Fig4.png (top)
- 13:45, 6 January 2019 (diff | hist) N File:Building completion Fig3.png (top)
- 13:44, 6 January 2019 (diff | hist) N File:Building completion Fig2.png (top)
- 13:40, 6 January 2019 (diff | hist) Building completion
- 13:39, 6 January 2019 (diff | hist) N File:Building completion Fig1.png (Building completion Fig 1) (top)
- 12:24, 6 January 2019 (diff | hist) Building completion
- 12:13, 6 January 2019 (diff | hist) Building completion
- 11:59, 6 January 2019 (diff | hist) Building completion
- 11:39, 6 January 2019 (diff | hist) N Building completion (Created page with "= Executive summary = Building completion is the critical stage in which the activities that have been undertaken to fulfil the building contact requirements are brought togethe...")
- 15:48, 5 January 2019 (diff | hist) N Collaboration: a quality management perspective (Created page with "== Summary == This article discusses what collaborative working is intended to achieve, emphasising the basis upon which collaboration can be successfully put in place between p...")
- 14:58, 5 January 2019 (diff | hist) The importance of welding assurance
- 14:57, 5 January 2019 (diff | hist) Structural steelwork: a quality perspective
- 14:55, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:49, 5 January 2019 (diff | hist) Quality manuals and quality plans
- 13:44, 5 January 2019 (diff | hist) Design: a quality management perspective
- 13:42, 5 January 2019 (diff | hist) Assurance and self-certification
- 13:41, 5 January 2019 (diff | hist) Assurance and self-certification
- 13:40, 5 January 2019 (diff | hist) Annex SL
- 13:38, 5 January 2019 (diff | hist) CDM Regulations: a quality perspective
- 13:35, 5 January 2019 (diff | hist) Design freeze: a quality perspective
- 13:33, 5 January 2019 (diff | hist) Why should quality be important to the construction industry?
- 13:31, 5 January 2019 (diff | hist) Change control: a quality perspective
- 13:29, 5 January 2019 (diff | hist) Mobilisation to site: a quality perspective
- 13:27, 5 January 2019 (diff | hist) Structural steelwork: a quality perspective
- 13:24, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:23, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:21, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:18, 5 January 2019 (diff | hist) Inspection & Test Plan
- 13:17, 5 January 2019 (diff | hist) How to write an inspection and test plan
(Latest | Earliest) View (newer 100 | older 100) (20 | 50 | 100 | 250 | 500)
Featured articles and news
Getting the most out of heating systems and heat pumps
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.