Self-build home: Occupy the home and rectify any defects
A meeting should be held to formally handover the completed site for occupation. Keys should be handed over, along with as-built drawings, certificates, warranties and so on.
A procedure should be agreed for reporting any defects.
The defects liability period (or rectification period) is a period set out in construction contracts (often 6 months) during which contractors are still bound by the terms of the contract and can be instructed to make good any defects that become apparent in the works.
The self builder should:
- Keep detailed notes about any defects that appear.
- Decide whether defects are design deficiencies or construction defects.
- Notify the responsible party and arrange access for inspection and rectification.
- At the end of the defects liability period, prepare a schedule listing defects that have not yet been rectified and agree with the contractor the date by which they will be rectified. The contractor must in any event rectify defects within a 'reasonable' time.
- Ensure that all outstanding warranties, instructions and other paperwork has been received.
- Finalise any outstanding party wall matters.
- Arrange final inspections of the works and if satisfied issue a certificate of making good defects.
- Agree the final account.
- Issue the final certificate and make the final payment.
If you have ideas for how to improve this plan, you can make changes yourself, just by clicking 'Edit this article', you can add ideas to the discussion page, you can submit a comment to us, or you can email [email protected].
Featured articles and news
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
Comments
Thank you very much for this, much appreciated.