About Cohwabrush
Paint brushes, bristle brush, roller brush and paint roller are all being produced and sold in the company.
Since Cohwa beginning in a few residential household in 1990 years crafted-hand paint roller. In 2013 years, our built 6000 square meter facility in economic development zone in DanYang City, now Cohwa is one of our nation larger paint rollers and paint brushes suppliers, also experience on exporting paint roller as well as a manufacturer of paint brush, paint tray and other painting tools to all over the world.
Cohwa supply a range of paint rollers suitable both DIY'ers and professional painter. There are also mini rollers and radiator rollers available. Paint rollers are supplied either in sets or together with sleeves, roller cages and paint trays, there are a multitude of sizes available, from 4″to 15" wide, and a selection of materials to choose from including high density foam, polyester, acrylic, microfiber and simulated sheepskin in a variety of pile types. All our rollers can be used with extension poles which we also supply, ranging from one to four meters in length, these are adjustable. Don't forget some dust sheets too to make sure those spatters and drips are nothing to worry about, available in heavy duty cotton or plastic.
Most of our paint brushes are filled with 100% natural China bristle, also we have a range of Synthetic filled brushes to satisfied different market in the world. Our brushes are suitable for all types of decorating, from the professional brushes through to the cost cutting disposable brushes.
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.























