Tomorrow's challenges in today's buildings - terms and conditions
Click here to return to the competition details.
- The judges’ decision is final and not subject to appeal. No correspondence will be entered into.
- Designing Buildings Ltd (DBL) reserves the right to present no prize if an insufficient number of deserving entries is received.
- DBL reserves the right, at its sole and absolute discretion, to use names, entry details and information about participants without obtaining further consent from the participant or providing any payment whatsoever to the participant for any commercial or non-commercial endeavours, publicity, advertising, trade or promotion in perpetuity.
- DBL reserves the right to modify the format and content of entries for publication purposes.
- DBL will not be responsible or liable for any problem, loss or damage of whatsoever nature suffered by any party due to any delay and/or failure in submitting entries to the competition.
- DBL will not be responsible or liable for any costs, problems, damage or loss of whatsoever nature to the participants resulting from their participation in the competition.
- DBL reserves the right to disqualify any participant that it determines is directly or indirectly tampering with the entry process or the operation of the competition and/or to be acting in breach or potential breach of these terms and conditions.
- Entries may reference (and hyperlink) other sources, but must not plagiarise them. Quotes and references must be clearly marked. Any form of plagiarism may result in disqualification. It is the responsibility of the participant to ensure that their entry does not infringe the copyright of any third party (including the use of images) or any other laws.
- Entries may only be submitted online following the instructions provided.
- Late entries will not be considered by the judges as part of this competition.
- DBL is responsible for administering this competition. BSRIA is responsible for awarding the prize.
- All enquiries should be directed to DBL at [email protected]. BSRIA will not enter into any correspondence.
- Entries should be submitted in English.
- Entry to the competition is deemed an acceptance of DBL’s general terms and conditions of use.
Featured articles and news
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.






















