Terrain Fabrication Service
Saving you time and money, with the Terrain Fabrication Service, we have the expertise and resources required to help you achieve the demands of your next project. By designing completely bespoke drainage stacks and fittings, we can offer you a high quality and customised solution.
Our Technical Team will design stacks and fittings that are bespoke to your project, whether it’s a whole drainage solution or unique ‘one-off’ problem solving application. All within the existing BS EN 12056 (Parts 2 and 3) and Building Regulations Part H standards/regulations.
Your stacks and fittings are manufactured in our state-of-the-art facility to the exact measurements by our highly skilled and experienced Fabrication Team. And for complete peace of mind, pressure testing of stacks is available on request
We dispatch the finished stacks to your site on time and ready to install. Each stack is labelled with a unique reference number so it can be slotted into the appropriate space quickly and easily – ensuring your project is completed on budget and on time.
Find out more here- http://www.polypipe.com/thefabricationservice
Featured articles and news
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
























