Security plan
Security Overlay to the RIBA Plan of Work, published by the RIBA in 2023, states:
The Security Plan contains the day-to-day methodologies for managing security measures once a building is in
operation e.g., the provision of a security guard at a building’s reception or the timing for security walk rounds.
The Security Plan is a documented, systematic set of policies and procedures setting out how to achieve security needs or objectives identified in the Security Strategy for the operation of the asset. The Security Plan:
- Will be developed after the Security Risk Assessment
- Detail how the measures selected after the Security Risk Assessment will be integrated with each other and operated
- Cover all aspects of security including physical, personnel, information, and cyber security
- Detail the policies and procedures for achieving the Security Requirements identified in the Project Brief.
[edit] Related articles on Designing Buildings
Featured articles and news
Biodiversity net gain, tips and tools for small sites
How to deal with BNG when options become limited.
Registered building inspectors
Building types and conflicts of interest updates explained.
A brief run-down reminder of key points to note.
BSRIA's commitment to sustainability and net zero
Key documents that represent an early shift in thinking.
A resource for Cleaner Air, Better Tomorrow.
Awe-inspiring medieval great barns.
A history of timber construction in the UK
From a timber Stonehenge to half timber houses.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.