Final project brief
The RIBA Plan of Work 2013 defines the final project brief as: 'The Initial Project Brief amended so that it is aligned with the Concept Design and any briefing decisions made during Stage 2. (Both the Concept Design and Initial Project Brief are Information Exchanges at the end of Stage 2).'
BG 78/2021, Project Information Process, written by Nick Blake and John Sands, and published by BSRIA in January 2021, in relation to the initial project brief, it states: ‘The project brief is the final stage in defining the client’s requirements for the development of a building. The RIBA Plan of Work 2013 splits this activity into two steps, the initial project brief which is an outcome from RIBA Stage 1, and the final project brief, which is an outcome from RIBA Stage 2. The final project brief is what the design of the building will be based on.’
See: Project brief for more information.
[edit] Related articles on Designing Buildings Wiki
- Briefing documents.
- Business case.
- Client requirements.
- Comparison of works stages.
- Feasibility studies.
- Initial project brief.
- Output-based specification.
- Plan of work.
- Preliminary business case.
- Project brief.
- Project execution plan.
- RIBA Plan of Work.
- RIBA.
- Specification.
- Stakeholders.
- Statement of need.
- Strategic brief.
- Vision.
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.